Tendering Authority: Jaipur Development Authority
Tender ID3795646
Organisation NameJaipur Development Authority
Tender BriefCorrigendum : Construction Of Storm Water Drain In Sanganer Area Zone-8, Jda, Jaipur (phase-i)
Last Date For Submission18th May, 2026
Opening Date22 May, 2026
Cost
Document Cost5000.00
EMD13075240.00
Estimated Cost653762000.00
Location
CitySanganer
StateRajasthan

Register to see full details

BOQ Items
#ItemQtyUnits
1Dismantling of Flexible Pavements Dismantling of flexible pavements and disposal of ismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202 By Mechanical Means Bituminous Courses20637.00Cum
2Dismantling of Cement Concrete Pavements as per MoRD Specification Clause 202. Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately561.00Cum
3Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches wi dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil Upto 3 m depth114449.15Cum
4Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches wi dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil 3 m to 6 m depth21268.79Cum
5Carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. Earth, Sand, Lime, Morrum manure or sludge Add for each 50 M (upto 500 M.)64347.00Cum