Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4827500 |
|---|---|
| Organisation Name | Rural Works Department |
| Tender Brief | Corrigendum : Rrsmp/25-26 Sasaram-1/03(nit-04/26-27/42) |
| Last Date For Submission | 16th Jul, 2026 |
| Opening Date | 16 Jul, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 1521000.00 |
| Estimated Cost | 76041209.00 |
| City | Sasaram |
|---|---|
| State | Bihar |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Road Name:- Constraction of road From Bilaspu TO Yogiya, Length- 1.100km, Block- Chenari Setting Out Pillars Providing & Fixing of Working benchmark Pillars 2 nos. per km & 6 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I | 1.100 | KM |
| 2 | Clearing and Grubbing Road Land (By manual means) including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification clause 201.1 and direction of E/I | 0.290 | Hect. |
| 3 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material )obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (having CBR not less than 5%) | 716.250 | Cum |
| 4 | Scarifying Existing Bituminous Surface Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 721.880 | Sqm |
| 5 | Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (B) Cement concrete | 0.810 | Cum |
8 Days Left