Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Rural Development Department
Tender ID3890215
Organisation NameRural Development Department
Tender BriefConstruction Of Karad Panchayat Samiti Administrative Building Tal-karad Dist-satara
Last Date For Submission8th Apr, 2026
Opening Date09 Apr, 2026
Cost
Document Cost29500.00
EMD1070000.00
Estimated Cost1069974655.00
Location
CitySatara
StateMaharashtra

Register to see full details

BOQ Items
#ItemQtyUnits
1Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting excetra complete. - (Lift upto 1.5 metre) By Mechanical Means Item / Page No : 2 / 153 Specification No : Bd.A.1 Spec. Page No : 259 Additional Specifications : The useful excavated material shall be utilised as directed by the Engineer in-charge.690.1800Cubic Metre
2Providing dry trap/ granite/ quartzite/ gneiss rubble stone soiling 15 centimetre to 20 centimetre thick including hand packing and compacting, excetra complete. Item / Page No : 38 / 157 Specification No : Bd.A.12 Spec. Page No : 264 409.5600Cubic Metre
3Filling in plinth and floors with contractors material / brought from outside and approved by Engineer In-Charge, in 15 centimetre to 20 centimetre layers including watering and compaction, excetra complete. Item / Page No : 37 / 157 Specification No : Bd.A.11 Spec. Page No : 263-264 1258.7800Cubic Metre
4Providing preconstructional antitermite treatment as per Indian Standard 6313 (Part-II) by treating the top surface of plinth filling at the rate of 5 litres of emulsion concentrate of 1.0 percent of clorophyriphoas per square metre of surface area covering ten years guarantee on bond paper. Item / Page No : 24 / 156 Additional Specifications : 1. The work shall be carried out as per instructions of Engineer in-charge. 2. The amount of 10 percent of the total cost of the completed item sahll be retained as retention money for the full guarantee period of ten years. 3. If the use of any chemical is found banned by the Government, proper substitute chemical will be allowed to be used as per manufactures code of practice. The chemical shall be got approved from Engineer in-charge. 4. The recoupment of the damages if any found and communicated to the contractor in writing is not made good within two weeks from the date of receipt of such communication by him, the same shall be carried out departmentally on his behalf and cost thereof shall be met with from sum withheld as aforesaid. In case the sum recoverable from the contractor is more than that of the sum of withheld amount, the difference shall stand recoverable as arrears of land revenue from the contractor under clause 20 of original contract. 5. The mode of measurement shall be on square metre basis.2266.2600Square Metre
5Providing preconstructional antitermite treatment as per Indian Standard 6313 (Part-II) by treating the backfill in immidiate contact with foundation at the rate of 5 litres of emulsion concentrates of 1.0 percent of clorophyriphoas per square metre of vertical surface area covering ten years guarantee on bond paper. Item / Page No : 23 / 155 Additional Specifications : 1. The work shall be carried out as per instructions of Engineer in-charge. 2. The amount of 10 percent of the total cost of the completed item sahll be retained as retention money for the full guarantee period of ten years. 3. If the use of any chemical is found banned by the Government, proper substitute chemical will be allowed to be used as per manufactures code of practice. The chemical shall be got approved from Engineer in-charge. 4. The recoupment of the damages if any found and communicated to the contractor in writing is not made good within two weeks from the date of receipt of such communication by him, the same shall be carried out departmentally on his behalf and cost thereof shall be met with from sum withheld as aforesaid. In case the sum recoverable from the contractor is more than that of the sum of withheld amount, the difference shall stand recoverable as arrears of land revenue from the contractor under clause 20 of original contract. 5. The mode of measurement shall be on square metre basis.268.7500Square Metre