| Tender ID | 3889291 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Construction Of New Khatav (vaduj) Panchayat Samiti Administrative Building Tal.khatav Dist.satara |
| Last Date For Submission | 7th Apr, 2026 |
| Opening Date | 08 Apr, 2026 |
| Document Cost | 29500.00 |
|---|---|
| EMD | 1917100.00 |
| Estimated Cost | 191706346.00 |
| City | Satara |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Labour charges for removing grass, thorney shrubs, Jungli shrub, Kubabul and alike grass along roadside making the ground clean by showel and phavaras etc. complete. | 3,370.49 | Square Metre |
| 2 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift upto 1.5 metre) by Mechanical Means.. | 1,631.20 | Cubic Metre |
| 3 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift from 1.5 metre) by Mechanical Means.. | 815.60 | Cubic Metre |
| 4 | Excavation for foundation in hard murum and boulders including removing the excavated material up to a distance 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift upto 1.5 metre) by Mechanical Means. | 721.88 | Cubic Metre |
| 5 | Excavation for foundation in hard murum and boulders including removing the excavated material upto a distance of 50 metre, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift from 1.5 metre to 3.0 metre) by Mechanical Means. | 1,104.77 | Cubic Metre |