Tendering Authority: Rural Development Department
Tender ID3889291
Organisation NameRural Development Department
Tender BriefConstruction Of New Khatav (vaduj) Panchayat Samiti Administrative Building Tal.khatav Dist.satara
Last Date For Submission7th Apr, 2026
Opening Date08 Apr, 2026
Cost
Document Cost29500.00
EMD1917100.00
Estimated Cost191706346.00
Location
CitySatara
StateMaharashtra

Register to see full details

BOQ Items
#ItemQtyUnits
1Labour charges for removing grass, thorney shrubs, Jungli shrub, Kubabul and alike grass along roadside making the ground clean by showel and phavaras etc. complete.3,370.49Square Metre
2Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift upto 1.5 metre) by Mechanical Means..1,631.20Cubic Metre
3Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift from 1.5 metre) by Mechanical Means..815.60Cubic Metre
4Excavation for foundation in hard murum and boulders including removing the excavated material up to a distance 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift upto 1.5 metre) by Mechanical Means.721.88Cubic Metre
5Excavation for foundation in hard murum and boulders including removing the excavated material upto a distance of 50 metre, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift from 1.5 metre to 3.0 metre) by Mechanical Means.1,104.77Cubic Metre
7th Apr, 2026