Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5026289 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Strengthning Of Bamahauri Approach Road Length 0.80 Km, Under Sub Division Satna |
| Last Date For Submission | 5th Aug, 2026 |
| Opening Date | 07 Aug, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 73700.00 |
| Estimated Cost | 7361103.00 |
| City | Satna |
|---|---|
| State | Madhya Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees having girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. A In area of light jungle | 0.16 | hectare |
| 2 | Scarifying existing bituminous surface to a depth of 50 mm by mechanical means Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres. | 720.00 | Sqm |
| 3 | Crusher Run Macadam Sub Base/Base Course Providing crushed stone aggregate, depositing on a prepared surface by hauling vehicles, spreading and mixing with a motor grader, watering and compacting with a vibratory roller as per clause 410 to form a layer of sub-base/Base in accordance to Table No. 400-14, 400-15 and as per clause of section 407 of specifications. (ii) For 37.5 mm maximum size | 712.00 | Cum |
| 4 | Construction of Shoulders with approved material/selected soil i/c excavation all lifts & leads i/c grading to required slope & camber of 4% and compacting on OMC using vibratory roller of 80 to 100 kN static weight. Field compaction shall be done in corresponding layers of carriage way thickness and meet the requirements of MDD to achieve compaction (98% -100%) as per relevant clause of 408. A Hard Shoulders (CBR value >12) | 1243.20 | Cum |
| 5 | Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub- base over a prepared sub-grade or drainage layer with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver finisher with electronic sensor, compacting with 8- 10 tonnes vibratory roller, finishing and curing as per clause 601 of specification complete in all respect | 314.89 | Cum |
15 Days Left