| Tender ID | 3772162 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Cleaning Of Manholes, Sewage Line, Septic Tank And Replacement Of Sewage Line Etc In Area Of Age B/r-i Under Ge Saugor |
| Last Date For Submission | 8th Apr, 2026 |
| Opening Date | 11 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 14000.00 |
| Estimated Cost | 700000.00 |
| City | SAUGOR |
|---|---|
| State | Madhya Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Cleaning of septic tank of any capacity by mechnical means including vaccume suction, taking off suitable capacity fitted with vaccume sunction pump of capacity not less than 15 cum/hr and deposited the sludge and water outside the MOD land complete all as specified and directed. | 500.00 | Cum |
| 2 | Cleaning of blockage of gully traps, Nahani traps, Floor traps incl removing gratings and re-fixing old or new gratings with white cement complete all as specified and directed. | 1500.00 | Each |
| 3 | M&L for cleaning of sewage line SWG/CI pipe/ RCC pipe/PVC pipe etc vertically/horizontally of dia n.exc 200 mm by rodding and well flushing by using sufficient water and making it clear for easy flow of sewage from WC, gully trap, Nahani trap etc upto the first manhole including desludging of first manhole and making it the proper functional to entire satisfaction of Engineer-in-Charge and removing the sludge, silt away from Bldgs etc upto a distance exc 50 m and n.exc 500 m and burying it in pits and covered with earth complete all as specified and directed. | 1500.00 | Each |
| 4 | Note for item No. 2 &3 :- 1 Contractor may have to deploy more manpower in the particular area including all necessary T&P / equipmen to resolve the complaint within 06 hours of complaint received (on same day). 2. In case contractor fails to get the complaint rectified within 06 hours of complaint received, he shall be penalised for the same at a flat rate of Rs 200/- per complaint , in addition to cost incurred by the department for rectification of complaints from third party. 3. Proper records (date wise) of complaints received & rectified by the contractor shall be maintained and shall be produced for verification at the time of payment of each RAR/Bill. | ||
| 5 | All as per Srl item No 03 here -in-before but length of sewage line cleaned manhole to manhole complete by rodding and well flushing with sufficient water, length of sewage line upto 10 M including desludging of both sides existing manholes complete all as specified and directed. | 400.00 | Each |