Tendering Authority: Military Engineer Services
Tender ID3772162
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Cleaning Of Manholes, Sewage Line, Septic Tank And Replacement Of Sewage Line Etc In Area Of Age B/r-i Under Ge Saugor
Last Date For Submission8th Apr, 2026
Opening Date11 Apr, 2026
Cost
Document Cost500.00
EMD14000.00
Estimated Cost700000.00
Location
CitySAUGOR
StateMadhya Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Cleaning of septic tank of any capacity by mechnical means including vaccume suction, taking off suitable capacity fitted with vaccume sunction pump of capacity not less than 15 cum/hr and deposited the sludge and water outside the MOD land complete all as specified and directed.500.00Cum
2Cleaning of blockage of gully traps, Nahani traps, Floor traps incl removing gratings and re-fixing old or new gratings with white cement complete all as specified and directed.1500.00Each
3M&L for cleaning of sewage line SWG/CI pipe/ RCC pipe/PVC pipe etc vertically/horizontally of dia n.exc 200 mm by rodding and well flushing by using sufficient water and making it clear for easy flow of sewage from WC, gully trap, Nahani trap etc upto the first manhole including desludging of first manhole and making it the proper functional to entire satisfaction of Engineer-in-Charge and removing the sludge, silt away from Bldgs etc upto a distance exc 50 m and n.exc 500 m and burying it in pits and covered with earth complete all as specified and directed.1500.00Each
4Note for item No. 2 &3 :- 1 Contractor may have to deploy more manpower in the particular area including all necessary T&P / equipmen to resolve the complaint within 06 hours of complaint received (on same day). 2. In case contractor fails to get the complaint rectified within 06 hours of complaint received, he shall be penalised for the same at a flat rate of Rs 200/- per complaint , in addition to cost incurred by the department for rectification of complaints from third party. 3. Proper records (date wise) of complaints received & rectified by the contractor shall be maintained and shall be produced for verification at the time of payment of each RAR/Bill.
5All as per Srl item No 03 here -in-before but length of sewage line cleaned manhole to manhole complete by rodding and well flushing with sufficient water, length of sewage line upto 10 M including desludging of both sides existing manholes complete all as specified and directed.400.00Each
8th Apr, 2026