Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID4424992
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Special Repair To Building No Es-16 Under Age B/r-i Of Ge Saugor
Last Date For Submission27th Jun, 2026
Opening Date29 Jun, 2026
Cost
Document Cost1000.00
EMD250000.00
Estimated Cost17500000.00
Location
CitySAUGOR
StateMadhya Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1M&L for installation of false ceiling using Square edge Glass fibre core fully encapsulated ceiling tile of size 595x595x15mm having volume density 100~110Kgs/m3, weight 1.8kg/m2 and 0.3mm thick suspended metal grid system complete all as per manufacturer's instructions and all as specified and directed. Make : ANUTONE (Tiles-Subtex Ebony & grid system-Skelet Trelis T15) or equivalent of Armstrong Ceiling Solutions / Saint-Gobain Gyproc Note : False ceiling must comply the following technical Parameters:- a) Fire (Class) - 1 & P b) Acoustics NRC 0.9, c) Thermal conductivity (W/mk) 0.066 d) Climate ( C, RH) 40, 95 e) Light reflectance (%) low f) Green (VoC, RC %) Low, 35158.00Sqm
2M&L for installation of false ceiling using perforated GFR gypsum panel, backlined with acoustical fleece, having 3x3mm square perforations @ 8.33mm pitch in H1 pattern, size 1200x2400x12.5mm tapered long edges, volume density of base board 700 Kgs/m3, weight 9Kgs/m2 installed by using suspended metal grid system (Strut framework system) complete all as per manufacturer's instructions and all as specified and directed. Make : ANUTONE (Tiles-Pixel 0308 H18 & grid system-Strut framework system) or equivalent of Armstrong Ceiling Solutions / Saint-Gobain Gyproc Note : False ceiling must comply the following technical Parameters:- a) Fire (Class) - 1 & P b) Acoustics NRC 0.8, c) Climate ( C, RH) 50, 70 d) Light reflectance (%) Paint dependent e) Green (VoC, RC %) Low, 25735.00Sqm
3M&L for installation of wall panelling/ lining using Slats, made of pinewood E1 grade fibe rboard, melamine finish, groove perforated slats L24-2 - (2mm grooves @24mm pitch with 4.9% open area) , backlined with Sound texblack acoustical fleece of 0.27mm thick, surface density 63g/m2,tongue-groove edge for a seamless look, 5-test fire retardant grade, size 192x2440x16mm, volume density of base board 700Kg/m3, weight of base board 11.2Kg/m2 installed by using Strut framework system complete all as per manufacturer's instructions and all as specified and directed. Make : ANUTONE (slate-Salon Series Slats Surco Plus & grid system-Strut framework system) or equivalent of Armstrong Ceiling Solutions / Saint-Gobain Gyproc Note : False ceiling must comply the following technical Parameters:- a) Fire (Class) - A b) Acoustics NRC 0.8, d) Climate ( C, RH) 50, 70 e) Light reflectance (%) 75 (Maple Arce) f) Green (VoC, RC %) E1, 25300.00Sqm
4M&L for installation of wall panelling/ lining using Slim, poly fibre panels, core-pigmented, high-density, Synth PF rigid panels of size 1200x2400x9mm, volume density 200-210kg/m3, weight 1.8kg/m2 adhered on backer board, square edge magnetite bonded 2mm wide pinewood fibre core tiles of size 600x1200x10mm, volume density 400kgs/m3, weight 4kg/m2 and Strut framework system complete all as per manufacturer's instructions and all as specified and directed. Make : ANUTONE (panels-Synth PF & grid system-Strut framework system) or equivalent of Armstrong Ceiling Solutions / Saint-Gobain Gyproc Note : False ceiling must comply the following technical Parameters:- a) Fire (Class) - A b) Acoustics NRC 0.9, c) Thermal (W/mk) 0.04 d) Climate ( C, RH) 50, 99 e) Light reflectance (%) Colour Dependant f) Green (VoC, RC %) Nil, 60350.00Sqm
5Demolition of brick work or stone/ boulder masonry work built in cement mortar including all quoins, arches, pillars etc but excluding ashlar facings, dressed stone work and precast concrete articles complete all as specified and as directed.35.00Cum
27th Jun, 2026

10 Days Left

WhatsApp