Tendering Authority: Rural Development Department
Tender ID4076336
Organisation NameRural Development Department
Tender BriefConstructing Concrete Bandhara At Ovaliye Khalchiwadi Gavhali Tal. Sawantwadi Dist- Sindhudurg
Last Date For Submission6th May, 2026
Opening Date08 May, 2026
Cost
Document Cost1000.00
EMD17000.00
Estimated Cost1344619.00
Location
CitySAWANTWADI
StateMaharashtra

Register to see full details

BOQ Items
#ItemQtyUnits
1Cleaning cutting thorny bushes, grass as directed with 15 m lead and lift upto 1.50 m.1740.00Smt
2Excavation in all kinds of soil & Soft murum including boulders up to 0.6 m diameter (0.113 cum) for canal, seating of embankment, filter drains / catch water drains etc., and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc. complete with lead up to 15 m and all lifts as directed.352.56Cmt
3Excavation in hard murum including boulders up to 0.6 m diameter (0.113 cum) for canal, seating of embankment, filter drains / catch water drains etc., and placing the excavated stuff neatly in dump area or for formation of service road / embankment including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc., complete with lead up to 15 m and all lifts as directed.587.61Cmt
4Excavation in soft rock without blasting including boulders up to 0.6 m diameter (0.113 cum) for canal, seating of embankment, filter drain / catch water drains etc., and placing the excavated soft rock neatly in dump area or for formation of service road including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc. complete with lead up to 15 m and all lifts as directed.235.04Cmt
5Excavation in hard rock of all toughness by blasting including boulders above 0.6 m dia.(0.113Cum) minimizing damage to side slopes of excavation in water prism area by adopting any one or combination of line drilling /pre-splitting /smooth blasting techniques and placing the excavated rock neatly in approved dump area including cost of all materials, machinery, labour, leveling bed etc., complete with lead up to 15 m and all lifts as directed.50.96Cmt
6th May, 2026

12 Days Left

WhatsApp