| 1 | Notes:
Notes:-
1. Contractor need to purchase minimum 50% of all items mentioned in this CA within 20 days of getting sample approval and kept in custody so that no delay in work due to non-availability of materials will be faced. Contractor should ensure during the cause of work that he has minimum 25% of materials with him till the completion of item/date.
2. Contractor should buy the exact items which are given with catalogue reference. Other makes will be approved only by submitting non availability Certificate Company. Contractor need to remove all the dismantled items without delay.
3. Rate quoted for demolition/dismantling /taking down is inclusive of removing the same from site and dumping at given locations anywhere inside station.
4. If any painting works, contractor need to clean the area and remove the drop marks from floor, doors, windows, sills, inbuilt furniture items etc. otherwise a recovery of Rs 10.00 per sqm in internal paintings and Rs 5.00 per sqm for external paintings will be made from contractor.
5. Contractor should maintain separate registers for plumbing and carpenter repair works. Day to day complains should be noted in those registers with SI nos of complaints, location, qty of work, status of complaints and signature of incharge and stamp of the office. Format will be given from AGE B/R Office. Contractor should obtain the signature of incharge on the same day of work. These registers to be submitted to JE (Civ) on every weekend without fail.
6. List of complaints will be given to contractor on the first week of every month. Contractor should ensure all the works will be completed within that month itself.
7. Contractor will make his own arrangement to store his items.
8. Some places in this contract where the vehicle will not reach the spot directly, the material will be moved manually in these places. The rate quoted will be considered all inclusive on this account.
9. All trade skilled labour required in this contract shall be present daily in working hours, irrespective of complaints received.
10. Complaint for a similar items may be in scattered / different area, quoted rate will be considered all inclusive on this account.
| | |
| 2 | M&L for preparing of old decorated surfaces and applying one coat of cement based paint on walls with using of all scaffolding,trestles,ladders,cradles which are necessary for execution of work and protective measures including removing of nails,making good holes,cracks,washing floors, cleaning glass,joinery,electric fitting,wiring etc of drops and splashes and leaving premise,clean and tidy all as specified & directed by the Engr-in-Charge. | 12000.00 | SQM |
| 3 | M&L for preparation and complete removal of existing treatment on walls of old decorated surfaces and applying two coats of cement based paint on walls with using of all scaffolding,trestles,ladders,cradles which are necessary for execution of work and protective measures including removing of nails,making good holes,cracks,washing floors, cleaning glass,joinery,electric fitting,wiring etc of drops and splashes and leaving premise,clean and tidy all as specified & directed by the Engr-in-Charge. | 2000.00 | SQM |
| 4 | M&L for preparing old surfaces and applying one coat of cement wash using Portland cement with using of all scaffolding,trestles,ladders,cradles which are necessary for execution of work and protective measures including removing of nails,making good holes,cracks,washing floors, cleaning glass,joinery,electric fitting,wiring etc of drops and splashes and leaving premise,clean and tidy all as specified & directed by the Engr-in-Charge. | 5000.00 | SQM |
| 5 | M&L preparation of previously treated wood or wood based surfaces of any description over 10 cm width or girth and applying one coat of synthetic enamel paint with using of all scaffolding,trestles,ladders,cradles which are necessary for execution of work and protective measures including removing of nails,making good holes,cracks,washing floors, cleaning glass,joinery,electric fitting,wiring etc of drops and splashes and leaving premise,clean and tidy all as specified & directed by the Engr-in-Charge. | 3000.00 | SQM |