| Tender ID | 5014107 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Provn Of Simulator Rooms With Stand By Power Arrangement At Arty Centre Hyderabad Under Ge Golconda |
| Last Date For Submission | 21st Aug, 2026 |
| Opening Date | 28 Aug, 2026 |
| Document Cost | 3000.00 |
|---|---|
| EMD | 660800.00 |
| Estimated Cost | 67159390.00 |
| City | Secunderabad |
|---|---|
| State | Telangana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Schedule 'A' Part - I BUILDINGS & STRUCTURES This Schedule contains Sl item No. 1.01 which is not prepriced by MES and the prepriced rate indicated in Col - 5 as `0.00 indicates this fact only. The tenderer is required to quote their rates in Column 6. | ||
| 2 | Lumpsum price worked out by the contractor for "Construction of Simulator Room in single storey in RCC framed structure with RCC roof including all fittings and fixtures complete all as shown on drawings and as specified and directed". Note: The quoted rate is deemed to be include earth work involved in footings and the cost of earth work excavation, cutting, filling and disposal to bring natural GL to proposed GL/ made up GL as specified in PS Clause 2.1.3. on Sl page No 120 (R) | 3.00 | Each Block |
| 3 | Lumpsum price worked out by the Contractor for SITE CLEARANCE, EARTH WORK AND EXCAVATION as listed in Schedule A Part-II Representing ** ____ % ____ percent *Above / Below the lumpsum price of 32,61,386.02 inserted by the MES in Schedule A Part-II | 1.00 | Lumpsum |
| 4 | Lumpsum price worked out by the Contractor for INTERNAL WATER SUPPLY " as listed in Schedule A Part-III Representing ** ____ % ____ percent *Above / Below the lumpsum price of 86,815.65 inserted by the MES in Schedule A Part- III | 1.00 | Lumpsum |
| 5 | Lumpsum price worked out by the Contractor for INTERNAL ELECTRICFICATION " as listed in Schedule A Part-IV Representing ** ____ % ____ percent *Above / Below the lumpsum price of 14,74,828.29 inserted by the MES in Schedule A Part-IV | 1.00 | Lumpsum |
24 Days Left