Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4382796 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair And Maint Of Ht Network Including Transformer And Other Associated Works At Cqa (icv) Area Under Ge Golconda |
| Last Date For Submission | 19th Jun, 2026 |
| Opening Date | 22 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 16000.00 |
| Estimated Cost | 798000.00 |
| City | Secunderabad |
|---|---|
| State | Telangana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dehumidification and filteration of transformer oil at different locations by dehumidification plant and including testing of oil samples both before and after filteration, the dielectric strength of the transformer oil shall be not less than 40 KVA with 2 mm gap after filtration complete all as specified and directed. Note : (a) The quoted rate shall be deemed to be include for necessary T&P for collection of transformer oil sample, testing kit, filteration plant and also include for making necessary connection to filtration plant from transformer and switch gear. (b) Test results obtained shall be recorded and submitted to Engineer-in-charge and kept in record duly signed. | 600 | Ltrs |
| 2 | S&F transformer oil low viscosity of approved make / quality with rupturing capacity 60 KV for 60 Seconds suitable for 11 KV tansformer as per IS 335 of 1983 for topping up / replacement complete all as specified and directed. Note : The Transformer oil shall be of ISI Marked, approved make and brought at site in sealed container only. | 40 | Ltrs |
| 3 | Disconnecting defective oudoor / indoor power distribution transformer of capacity 200 / 500 KVA from HT/LT and earth conection and including taking out from two pole structure / plinth and removing out complete transformer oil, storing the same in suitable containers (to be provided by contractor) opening top cover and lifting up the core assembly carefully to check the condition of transformer winding core refixing the same after repair, refilling the transformer oil after dehumidification and filteration including checking of leakage of transformer body and welding works required for making transformer body leak proof, transportation of transformer from site to work shop and re-installing the same at any site and painting of transformer complete all as specified and directed. Note: (i) The materials required for rectification of defects such as rewinding / transformer oil / bushes / LV Bushes / Insulators / HV bushes / insulators and gasket kit and oil filteration etc, shall be measured and paid separately. (ii) Dehumidification and filteration shall be measured and paid separately. | 1 | Each Job |
| 4 | Removing the burnt out HT winding of transformer of capacity upto 500 KVA and rewinding with braided copper conductor to match with the existing gauge and No. of turns complete all as specified and directed. | 60 | Kg |
| 5 | All as per Sl. item No. 04 above but for LT windings | 30 | Kg |
6 Days Left