Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4140908 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair To Chajja, False Ceiling, Flooring And Other Connected Items At Af Stn Hakimpet Under Ge (af) Hakimpet |
| Last Date For Submission | 27th May, 2026 |
| Opening Date | 29 May, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 56000.00 |
| Estimated Cost | 2800000.00 |
| City | Secunderabad |
|---|---|
| State | Telangana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Notes: Notes:- 1. Contractor need to purchase minimum 50% of all items mentioned in this CA within 20 days of getting sample approval and kept in custody so that no delay in work due to non-availability of materials will be faced. Contractor should ensure during the cause of work that he has minimum 25% of materials with him till the completion of item/date. 2. Contractor should buy the exact items which are given with catalogue reference. Other makes will be approved only by submitting non availability Certificate Company. Contractor need to remove all the dismantled items without delay. 3. Rate quoted for demolition/dismantling /taking down is inclusive of removing the same from site and dumping at given locations anywhere inside station. 4. If any painting works, contractor need to clean the area and remove the drop marks from floor, doors, windows, sills, inbuilt furniture items etc. otherwise a recovery of Rs 10.00 per sqm in internal paintings and Rs 5.00 per sqm for external paintings will be made from contractor. 5. Contractor should maintain separate registers for plumbing and carpenter repair works. Day to day complains should be noted in those registers with SI nos of complaints, location, qty of work, status of complaints and signature of incharge and stamp of the office. Format will be given from AGE B/R Office. Contractor should obtain the signature of incharge on the same day of work. These registers to be submitted to JE (Civ) on every weekend without fail. 6. List of complaints will be given to contractor on the first week of every month. Contractor should ensure all the works will be completed within that month itself. 7. Contractor should ensure that plumbing complaints resulting in wastage of water should be attended and rectified within 24 hours. Otherwise, a recovery of 25% of corresponding item will be made from contractor. 8. Contractor will make his own arrangement to store his items. 9. Some places in this contract where the vehicle will not reach the spot directly, the material will be moved manually in these places. The rate quoted will be considered all inclusive on this account. 10. All trade skilled labour required in this contract shall be present daily in working hours, irrespective of complaints received. 11. Complaint for a similar items may be in scattered / different area, quoted rate will be considered all inclusive on this account. | ||
| 2 | Taking down plaster from chajja/facia etc including dismantling of damaged concrete and repair the same with RCC (1:2:4) type B1 concrete on chajja of any width n.exc 60 cms, applying 10mm thick plaster in CM 1:3 mixed with WPC @3% by weight of cement (WPC shall be paid for separately) and applying two coat of cement base paint with primer to match the existing, finished even and smooth using extra cement with out extra cost all as specified and directed by Engr-in-charge. | 110.00 | RM |
| 3 | Taking down cement plaster of any description of any thickness from brick wall surfaces or stone surfaces etc including racking out joints and hacking for key, scrubbing down with water and removing the debris out of MOD land etc complete all as specified and directed. | 370.00 | Sqm |
| 4 | M&L Rendering 15 mm thick mixed with water proofing compound up to 6.5m ht as per manufactures instruction on fair faces of brick work or concrete surfaces in CM 1:4 is to be finished even and smooth (with out using extra cement) using of all scaffolding, trestles, ladders, cradles which are necessary for execution of work and protective measures including cleaning glass, joinery, electric fitting, wiring etc of drops and splashes and leaving premise, clean and tidy complete all as specified and directed Note :- Liquid water proofing compound to be measured under separate item as supply only. | 220.00 | Sqm |
| 5 | Supply only integral water proofing compound. | 38.28 | Kg |
6 Days Left