Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4432917 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repairs And Maintenance To Ht Electric Supply System And Allied Works At Afs Hakimpet |
| Last Date For Submission | 24th Jun, 2026 |
| Opening Date | 30 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 80000.00 |
| Estimated Cost | 4000000.00 |
| City | Secunderabad |
|---|---|
| State | Telangana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Disconnecting the HT / LT connection, taking out the transformers form its plinth at any situation with the help of suitable crane and transporting the transformer to civil work shop for carrying out necessary repairs and bringing back and re-install in its original place of capacity upto 400 KVA, 11KV complete all as specified and as directed. | 1.00 | Each Job |
| 2 | Isolating the transformer by carefully dismantling the HT / LT and earth connections, draining out the oil from transformer to the required level and storing in cleaned containers, opening the top cover and conservator tank from transformer, rectifying the defects and dismantling and repalcing burnt out LT/HT bushes and refixing back the same duly repalcing with GI nuts, bolts & washers of suitable size and making all HT /LT connections as per the original, re-filling the transformer oil to the required level and testing on completion for capacity up to 400 KVA, 11KV complete all as specified and as directed. NOTE: (i) LT /HT bush, trasformer oil for toping up will be measured and paid separetly as supply only under relevent items. | 6.00 | Each Job |
| 3 | Taking out complete core from transformers tank of capacity upto 400 KVA, cutting and removing burnt out winding and re-winding the same with super enamelled copper conductor of existing gauge with insulating materials, applying varnish, drying in heating chamber , re-assembling the transformer as per the original and testing on complete all as specified and as directed. Note: Shifting of transfermer from installed position to Civil work shop and back will be measured and paid separetly under relevent items. complete all as specified and as directed. | 450.00 | Kg |
| 4 | Material and labour for testing of the transformer oil before filteration if the value becomes below 30 KV, then only filtration to be carried out, after filtration job completed again BDV Value tested and values submitted to Engr-in-Charge in proper format for record complete all as specified and as directed.. Note : (a) Test results obtained shall be recorded & produced to the Engr-in-Charge. (b) Measuring equipments & T&P required shall be arranged by the contractor. (c) The rate quoted shal be deemed to include for making necessary connections to filteration plant from transformer and switch gear. (d) Electric supply for the filteration plant will be made available free of cost. | 200.00 | Ltr |
| 5 | Supply & fill transformer oil confirming to IS 335 of 2018, having dielectric strength 60 KV for topping up in transformers complete all as specified and as directed. Notes:- (i) Empty sealed container shall become Govt property. (ii) Transformer oil shall be of make as specified. (iii) Purchase vouchers alongwith manufacturer's test certificate shall be produced at the time of payment. | 800.00 | Ltr |
6 Days Left