Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4821347 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repairs To Internal Roads Including Road Furniture In Cdm Secunderabad Under Age B/r (n) No Ii Of Ge (north) Secunderabad. |
| Last Date For Submission | 30th Jul, 2026 |
| Opening Date | 06 Aug, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 60000.00 |
| Estimated Cost | 2999732.00 |
| City | Secunderabad |
|---|---|
| State | Telangana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces exceeding 50mm deep and not exc. 100 mm deep area not excceding 400 Sqm complete all as specified and directed. | 10.00 | X SQM |
| 2 | M & L for bituminous macadam (Consolidated thickness 75mm or less) using Hot mix plant & Mechanical paver with @4% (paving bitumen (VG-30) grade) binder content by weight of total mix , rolled and compacted by using 8 to 10 tonne power road roller to required camber and gradient complete all as specified and directed . Note: Soft stones such as lime stones, sandstones, slatestone etc will not be allowed to be incorporated in the work. | 7.50 | CUM |
| 3 | M & L for preparing the black top bituminous surface by brushing with wire brushes for removing cracked mud, sweeping with brooms and finally fanning the cleaned surfaces with air compressor to remove all loose dirt complete all as specified and directed. | 635.00 | X SQM |
| 4 | M & L for applying evenly a priming tack coat with bituminous primer @ 05 Kg / 10 Sqm of surface using paving bitumen complete all as specified and directed. | 635.00 | X SQM |
| 5 | M & L for laying and consolidating bituminous premixed ashphaltic semi-dense concrete 30 mm consolidtaed thickness with 5.5% binder content by weight of total mix by using paving bitumen (VG-30 Grade) any penetration rolled and compacted to required camber and gradient etc. with mechanical paver and rolled with 8 to 12 Tonne power roller complete all as specified and directed. | 635.00 | X SQM |
6 Days Left