| Tender ID | 4859551 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Provision Of Water Supply Line From Glph To Kvt Oht Under Age E/m-ii Ge (u) At Secunderabad. |
| Last Date For Submission | 3rd Aug, 2026 |
| Opening Date | 10 Aug, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 218500.00 |
| Estimated Cost | 14323256.00 |
| City | Secunderabad |
|---|---|
| State | Telangana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in trenches not exceeding 1.5 m width and not exc 1.5 m in depth and getting out in hard/dense soil for removing/laying of pipe line complete all as specified and directed. | 1164.00 | CUM |
| 2 | Returning, filling in, including spreading, leveling, watering and well ramming in layers not exc 25 cm in any type of soil complete all as specified and directed. | 990.00 | CUM |
| 3 | Removing excavated material (soils) n exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point complete all as specified and directed. | 174.00 | CUM |
| 4 | S&F ductile iron pressure pipes, class K9, centrifugally cast with spigot and socket ends as per following conforming to IS 8329/2000 with cement mortar lining inside the pipes with outside zinc coating suitable for push-on-joint (rubber gasket D jointing) in any length including DI specials as required at site confirming to IS 8329/2000 and all jointing materials and making good for disturbed surfaces of roads, path ways etc while laying the pipe line at site, site clearance for the route of pipe line, welding, cutting the existing header at GLPH and making connection including welding works for inserting branch connections etc complete all as specified and directed for the following sizes :- Notes:- (a) Quoted rates inclusive of Push on Joints / D-Joints as required (b) The contractor is responsible for obtaining the approval from Police Department for Traffic Diversion and related works if required in consultation with the MES department if required. (c) Contractor is responsible for repair/replacement of any damages to the existing structures, Under Ground HT/LT/OFC Cables etc during the course of execution. | ||
| 5 | 250 mm Dia | 1800 | RM |