Tendering Authority: Military Engineer Services
Tender ID3934635
Organisation NameMilitary Engineer Services
Tender BriefRepair To Storm Water Drain, Drain Covers And Culvert At Afs Hakimpet Ge (af) Hakimpet
Last Date For Submission27th Apr, 2026
Opening Date29 Apr, 2026
Cost
Document Cost500.00
EMD46000.00
Estimated Cost2300000.00
Location
CitySecunderabad
StateTelangana

Register to see full details

BOQ Items
#ItemQtyUnits
1Notes:- 1. Contractor need to purchase minimum 50% of all items mentioned in this CA within 20 days of getting sample approval and kept in custody so that no delay in work due to non-availability of materials will be faced. Contractor should ensure during the cause of work that he has minimum 25% of materials with him till the completion of item/date. 2. Contractor should buy the exact items which are given with catalogue reference. Other makes will be approved only by submitting non availability Certificate Company. Contractor need to remove all the dismantled items without delay. 3. Rate quoted for demolition/dismantling /taking down is inclusive of removing the same from site and dumping at given locations anywhere inside station. 4. If any painting works, contractor need to clean the area and remove the drop marks from floor, doors, windows, sills, inbuilt furniture items etc. otherwise a recovery of Rs 10.00 per sqm in internal paintings and Rs 5.00 per sqm for external paintings will be made from contractor. 5. Contractor should maintain separate registers for plumbing and carpenter repair works. Day to day complains should be noted in those registers with SI nos of complaints, location, qty of work, status of complaints and signature of incharge and stamp of the office. Format will be given from AGE B/R Office. Contractor should obtain the signature of incharge on the same day of work. These registers to be submitted to JE (Civ) on every weekend without fail. 6. List of complaints will be given to contractor on the first week of every month. Contractor should ensure all the works will be completed within that month itself. 7. Contractor should ensure that plumbing complaints resulting in wastage of water should be attended and rectified within 24 hours. Otherwise, a recovery of 25% of corresponding item will be made from contractor. 8. Contractor will make his own arrangement to store his items. 9. Some places in this contract where the vehicle will not reach the spot directly, the material will be moved manually in these places. The rate quoted will be considered all inclusive on this account. 10. All trade skilled labour required in this contract shall be present daily in working hours, irrespective of complaints received. 11. Complaint for a similar items may be in scattered / different area, quoted rate will be considered all inclusive on this account.
2Demolition of Brickwork or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles complete all as specified and directed100.00Cum
3Demolition of cement concrete of any description laid in any position complete all as specified and directed51.73Cum
4M&L Cement concrete Type D2 (1:4:8) using 40mm graded aggregate in foundations, filling and mass concrete complete all as specified and directed51.73Cum
5M&L Pre-cast cement concrete block masonry of type C1 1:3:6 (20mm graded aggregate) set in CM 1:4 with solid blocks, exc. 10 cm in width and setting in mortar, complete all as specified and directed.67.20Cum