Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4447809 |
|---|---|
| Organisation Name | Directorate Of Secondary Education |
| Tender Brief | Construction Of 05(five) Nos Girls Toilets In Baramura North Jb, Barnarayan Sb, Kathalia Bari Sb, Kaichya Khola Model Eng. Med And Bairagimura Model Eng. Med. Schools Under Nalchar, Kathalia And Mohanbhog Rd Blocks Of Sepahijala District For The Year |
| Last Date For Submission | 8th Jun, 2026 |
| Opening Date | 09 Jun, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 55000.00 |
| Estimated Cost | 2750000.00 |
| City | Sepahijala |
|---|---|
| State | Tripura |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil. | 100.025 | Cum |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.-All kinds of soil. | 66.685 | Cum |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 26.975 | Cum |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering --All work upto plinth level:1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate 20 mm nominal size) | 14.725 | Cum |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement--All work upto plinth leve.1:1 :3 ( 1 Cement: 1 fine sand : 3 graded stone aggregate 20 mm nominal size) | 23.52 | Cum |
8 Days Left