Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3645840 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Construction Of Block Public Helth Unit Bphus At Kanaipur Rural Hospital, Serampore Uttarpara Block, In The District Of Hooghly Civil And Electrical Installation Works. Balance Works |
| Last Date For Submission | 15th Apr, 2026 |
| Opening Date | 17 Apr, 2026 |
| Document Cost | 300.00 |
|---|---|
| EMD | 117473.00 |
| Estimated Cost | 5873643.00 |
| City | Serampore |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed. | 254.380 | Sq.M |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 17.090 | Cu.M |
| 3 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation. | 2.600 | Cu.M |
| 4 | Filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 130.580 | Cu.M |
| 5 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 47.130 | Sq.M |
8 Days Left