Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5023101 |
|---|---|
| Organisation Name | Kolkata Metropolitan Development Authority |
| Tender Brief | Routine Repair And Civil Maintainance Of B And D-type Staff Quarter, Filter House, Security Barracks, Raw And Clear Water Pump House And Administrative Building Alongwith Other Ancillary Works Within 20 Mgd Serampore Water Treatment Plant For 1 Year |
| Last Date For Submission | 28th Jul, 2026 |
| Opening Date | 30 Jul, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 3980.00 |
| Estimated Cost | 198860.00 |
| City | Serampore |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Supplying, fitting and fixing G.I. pipes of TATA make with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required, jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. Payment for painting will be made seperately.) (A) For Exposed Work | ||
| 2 | (i) 15 mm dia. medium quality | 12.000 | Mtr. |
| 3 | (ii) 20 mm dia. medium quality | 8.000 | Mtr. |
| 4 | (iii) 25 mm dia. medium quality | 4.000 | Mtr. |
| 5 | Supplying, fitting and fixing in position G.I.pipes of TATA make for underground works with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbow, nipple, short piece etc. including cost of all materials, jointing materials, cutting pipes, making threads, cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed with two coats of painting on G.I. pipes and specials with bituminous paint complete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials. No separate payment will be made for accessories, specials. Payment for painting will be made seperately.) |
7 Days Left