Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4353162 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Renovation Of Boys Hostel At Pt. Shambhu Nath Shukla University Old Campus Shahdol. |
| Last Date For Submission | 10th Jun, 2026 |
| Opening Date | 12 Jun, 2026 |
| Document Cost | 5000.00 |
|---|---|
| EMD | 50000.00 |
| Estimated Cost | 4238000.00 |
| City | Shahdol |
|---|---|
| State | Madhya Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 11525.58 | sqm |
| 2 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand over the plastered wall surface to prepare the surface even and smooth i/c all cost of material, labour and scaffold etc in all position complete. Note : Putty shall be applied only on the internal walls, for application on the exterior walls prior permission of Chief Engineer will be required | 11525.58 | sqm |
| 3 | Wall painting by any mechanical or manual means with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound) content less than 50 grams/ litre. of approved brand and manufacture, including applying additional coats wherever required to achieve even shade | 11525.58 | sqm |
| 4 | Repair to plaster of thickness 12mm to 20 mm in patches of area 2.5 sqm and under, including cutting the patch in proper shape, raking out joints and preparing plastering the wall surface with white cement based polymer modified self curing mortar, including disposal of rubbish, all complete as per the direction of Engineer-In-Charge. | 459.80 | sqm |
| 5 | Structural steel work using M.S. flats, angles, channels I-section, H-section etc. riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete | 4320.00 | kg |
6 Days Left