| # | Item | Qty | Units |
|---|---|---|---|
| 1 | The following works are carried out for Replacement of Gaskets of 40MVA T/F (ALSTOM make Mfg. Year 1998 Sr. No. B-29464) alongwith other associated Works at 132KV Sub Station Biswan, with all Cost of Men, Misc. Consumables, Crane / Hydra, Centrifuging Machine, Normal & Special T&Ps, etc. Required for Satisfactory Completion of the Job, as per Technical Specifications & Direction of the Supervising Engineer, as per details below : | ||
| 2 | Carriage of 20/40 KL empty oil tank for the centrifuging of T/F oil where it is available within distance of 50 Km Approx. including carefully loading empty oil tank at 132KV Substation Neri & unloading at 132KV Biswan. | 1 | Job |
| 3 | Removal of Jumpers of HV & LV side Bushings of the Transformer. The Scope of Work Involves Opening of Bolts & Nuts and Removal of Jumpers, Bushing Clamps etc. | 1 | Job |
| 4 | Complete Draining of the T/F Oil from the 40MVA Transformer (ALSTOM make) into Oil Tanker / Oil Drums and Stacking them at Proper Place. | 22000 | Lit. |
| 5 | Complete Dismantling of the 40MVA Transformer (TAL make). The Scope of Work Involves Dismantling of HV / LV / Neutral Bushings, Turrets, Radiators, Conservator Tank, Explosion Vent Pipe, Buchholz Relay, Oil Pipe Lines, Flanges, Valves, Cooling Fans etc. along with Opening of associated Electrical Connections, Stacking of all the Dismantled Parts at Proper Place in the Switchyard including Proper Blanking of the Open Points before Replacement of Gaskets. | 1 | Job |