Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4103799 |
|---|---|
| Organisation Name | Rural Engineering Department |
| Tender Brief | Construction Of Cc Road And Drain From Shri Gurudutt Sharma Farm Towards Bombay Bridge In Village Dighi. |
| Last Date For Submission | 1st May, 2026 |
| Opening Date | 02 May, 2026 |
| Document Cost | 2714.00 |
|---|---|
| EMD | 90000.00 |
| Estimated Cost | 4477000.00 |
| City | Sharma |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. As per Technical Specification Clause 302 II | 119.910 | CubMt. |
| 2 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301. Cartage 5Km | 444.900 | CubMt. |
| 3 | Construction of granular sub base by providing well graded material spreading in uniform layers with Tractor mount grader on prepared surface mixing by mix in place method Tractor with rotavator at OMC,and compacting with Three wheel 80-100 KN Static Roller to achieve the desire density,complete as per technical specification clause 401. | 131.050 | CubMt. |
| 4 | Providing, laying, spreading and compacting WBM grading-3 stone aggregates of specific sizes to water bound macadam specifications i/c spreading in uniform thickness, hand packing, rolling with three wheeled static roller 80-100 KN in stages to proper grde and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density,complete as per technical specification clause 405. | 140.570 | CubMt. |
| 5 | Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 (1:4 Cement C/Sand) | 158.670 | CubMt. |
5 Days Left