Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4038710 |
|---|---|
| Organisation Name | Integral Coach Factory |
| Tender Brief | Shell Kit For Memu Dmc1 Jk 944 A. Roof Assembly - 94416001 000 01 Alt 'nil' - 1 No. Location Of Sidewall -94414001 000 01 Alt 'nil' - 1 No. End Construction Pail End -94515001 000 01 Alt 'a' - 1 No. Firm Shall Fulfill The Manufacturing Facility As Per Icf/md/specn-200, Issue Status 01, Rev 04 With Amendment No 01. Firm Shall Fulfill The Manufacturing Facility As Per Icf/md/specn-315, Issue Status-01, Rev.00 With Amendment No 01. B.supply Of One Coach Set Of Body Shell Items And Partition Frames For Memu Dmc Jk 944 To Drawing Nos: 1. 94410003 000 01 Alt 'a' - 1 No. 2. 74510257 000 01 Alt Nil - 1 No. 3. 94410004 000 01 Alt Nil - 1 No. 4. 74510045 000 01 Alt Nil - 1 No. 5. 94410005 000 01 Alt Nil - 1 No. 6. 94410002 000 01 Alt 'b' - 1 No. 7. 94410076 000 01 Alt Nil - 1 No. 8. 94410072 000 01 Alt Nil - 1 No. 9. 94410054 000 01 Alt Nil - 2 Nos. C. Underframe Arrangement 94411001 000 01 Alt 'b' - 1 No. Firm Shall Fulfill The Manufacturing Facility As Per Icf/md/specn-147, Issue Status-01 Rev.02 With Amendment No.02. Special Condition : Packing As Per Icf/j&t/misc-2201, Alt 'f'. Packing As Per Icf/j&t/sk-1809, Alt 'a'. Packing Condition As Per Drg.no.icf/j&t/misc-2487, Alt 'b' The Underframe Should Be Supplied As Normal Side Up & Side Bearer Side Down. Packing Conditionas Per Icf/j&t/sk-1865, Alt 'a'. (a) Raw Material Stage # Ensure The Raw Material Used Using Portable Spectrometer (b) Jig Stage # Assembly Of Front Part With Sole Bar. # Assembly Of Modular Frame Arrangement. # Weld Parameters To Be Checked & Recorded (c) Trestle Stage # Marking, Drilling & Tapping Of Holes Wherever Necessary. # Marking & Placing Of Detail Items. # Complete Welding Wherever Necessary. # Weld Parameters To Be Checked & Recorded # Assembly & Welding Of Trough Sheets. # Dimensional & Visual Checks. # Punching Of Serial No & Ensuring Proper Traceability. (d) Surface Preparation And Painting Stage. # Short/sand Blast To The Requirements. # Painting Process As Per The Specification. # Visual Inspection. # Final Product Inspection. Note: Application Of Aluminium Welding Coat To Rcf Spec Mdts-28272 Latest Revision On Top Surface Of Cross Members Shall Be Ensured Before Welding The Trough Floor With Cross Members To Avoid Bi-metallic Corrossion. [safety Item ] |
| Last Date For Submission | 11th May, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 0.00 |
|---|---|
| EMD | 0.00 |
| Estimated Cost | 0.00 |
| City | Refer Documents |
|---|---|
| State | Tamil Nadu |
23 Days Left