Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID4122874
Organisation NamePublic Works Department
Tender BriefAnnual Repair And Maintenance of Various Type-i T Type-vi Of Gad At Kasumpti Shimla-
Last Date For Submission6th May, 2026
Opening Date06 May, 2026
Cost
Document Cost500.00
EMD28000.00
Estimated Cost0.00
Location
CityShimla
StateHimachal Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Steel work welded in built up sections, framed work including cutting hoisting fixing in position and applying a priming coat of red lead paint including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (a) In gratings, framed guards bars ladders, railing, brackets and similar work. in or as per direction of the Engineer- in - Charge850.00Per Kilogram
2Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (i) 0.63 mm thick sheet. ( Labour rate )3.60Per Square Meter
3Renewing glass panes, with putty and nails wherever necessary including racking out the old putty (i) Float glass panes of nominal thickness 4 mm including carriage of materials in all leads as per directions of the Engineer-in-Charge. (weight not less than 10kg/sqm)19.13Per Square Meter
4(ii) Frosted glass 5 mm thick5.72Per Square Meter
5Providing and fixing 1.50mm(One point Fifty milimetre) thick PVC antistatic venyl Flooring plain or coloured, carbed or mosaic/metalled finish laid with approved adhesive on sub-floor (damp proofing treatment to be paid for separately) including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.28.96Per Square Metre
6th May, 2026

7 Days Left

WhatsApp