Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5023756 |
|---|---|
| Organisation Name | Himachal Pradesh Irrigation And Public Health Department |
| Tender Brief | Augmentation Of Gwss Khorni Nallah To Barthata In Gp Barthata In Tehsil Jubbal Distt Shimla Hp Sh Construction Of Rcc Storage Tank Of 15000 Ltrs Capacity At Village Mural Ram Nagar |
| Last Date For Submission | 30th Jul, 2026 |
| Opening Date | 30 Jul, 2026 |
| Document Cost | 350.00 |
|---|---|
| EMD | 4900.00 |
| Estimated Cost | 243280.00 |
| City | Shimla |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in foundations , trenches etc., in earth work , lift up to 1.50 metres. Stacking the eacavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15 cm. (fifteen centimetres) layers , when required in to plinth and sides of foundations etc., conslolidating each of the disposited layer by ramming and watering and then disposing off all excavated soil as directed with in the load of 20 mtrs. Pick and Jumper work etc. complete as per the direction of the Engineer - in - Charge. | 10.14 | Cum. |
| 2 | Providing and laying cement concrete 1:3:6 (1cement: 3 sand: 6 graded stone aggregate 40mm (Forty millimeter nominal size) and curing complete excluding cost of from work in foundation and plinth with in all leads & lifts as per entire satisfication of Engineer-in-Charge. | 1.69 | Cum. |
| 3 | Providing and laying cement concrete 1:1:2 (1cement :1Sand: 2 graded stone aggregate 20 mm N/S) and curing complete excluding cost of form work and reinforcement for Rainforced concrete work in:- | ||
| 4 | Foundation and Plinth with in all leads and lifts as per the direction of the Engineer in Charge. | 2.27 | Cum. |
| 5 | Walls (Any thickness) attached pillasters, pillasters, buttresses, beam girder and contilevers upto floor two level with in all leads and lifts as per the direction of the Engineer in Charge. | 5.38 | Cum. |
9 Days Left