| Tender ID | 4854715 |
|---|---|
| Organisation Name | Rural Development And Panchayat Raj Department |
| Tender Brief | Construction Of Gramin Haat In The Parking Area Mc Building Near Lift Shimla ( Sh-dismantaling , Demolishing Of Existing Sheds And Construction Of Kiosks ( With Zmartbuild Q-con Steel Reinforced Wall Of Nxtbloc And Stretch Fabric Cloth Roofing ) |
| Last Date For Submission | 13th Jul, 2026 |
| Opening Date | 14 Jul, 2026 |
| Document Cost | 5000.00 |
|---|---|
| EMD | 298000.00 |
| Estimated Cost | 14927320.00 |
| City | Shimla |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)including carriage of materials within all leads and lifts. | 49.65 | Cum |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 cement: 3 coarse sand): 6 graded stone aggregate 20mm nominal size) complete within carriage of material in all leads and lifts. | 45.16 | Cum |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (1 cement: 2 coarse sand): 4 graded stone aggregate 20mm nominal size) complete within carriage of material in all leads and lifts. | 8.10 | Cum |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10(1 Cement: 5 coarse sand: 10 graded stone aggregate | 40.51 | Cum |
| 5 | Providing and fixing in position, Zmartbuid Q-con Steel reinfored wall of NXTBLOC making using necessary tools & equipments to install & fabricate the wall thin Cement mortar 1:3 and fastening the walls at end with steel angle and fasteners etc and making the wall smooth using sand paper etc and applying 2 coats of wall putty etc. completed in all respect as per drawings and specifications and under the overall direction of the Engineer-in-charge. | 639.77 | Sqm |