Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3933900 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Construction Of Hospital And Mch Block At Kather Tehsil And District Solan Hp Sh Supply, Installation, Testing and Commissioning Of Medical Grade Breathing And Therapeutic System Therein. |
| Last Date For Submission | 15th Apr, 2026 |
| Opening Date | 16 Apr, 2026 |
| Document Cost | 7000.00 |
|---|---|
| EMD | 419200.00 |
| Estimated Cost | 20955857.00 |
| City | Shimla |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Oxygen Manifold (10+10). The cylinders shall not be included in the quoted price. The manifold(s) should comply with HTM 02-01/NFPA 99/ DIN / EN / ISO-7396-1 standards. It shall be compatible with Class-D type bulk cylinders. Manifold shall consist of two high pressure header bar assemblies to facilitate connection of primary and secondary cylinder supplies. Each header bar shall be provided with respective numbers of cylinder pigtail connections to suit cylinder valves as per IS 3224/ BS/ ASME incorporating a check valve at the header connection. The high-pressure header bar shall be designed in such a manner that it can be extended to facilitate additional cylinder connections. Each header bar assembly shall be provided with a high pressure shut o valve. Oxygen Manifold should consist of 2 rows of respective numbers of class D-type bulk oxygen cylinders. The manifold should be hydraulically tested to 3000 psig. The manifold should be so designed that it shall suit easy cylinder changing and positioning. The system should have non-return valves for easy changing of cylinders without closing the bank. The cylinder should be placed with the help of cylinder brackets and fixing chains which should be galvanized. With a Warranty of 1 Years . Make AKTIV /Raj Med / HSIPL / Becon Medeas / Greggorson / Amico / Penlon. | 2.00 | Per set |
| 2 | Supply of Fully Automatic Oxygen Control Panel-2100LPM @ 50 to 55 PSI The fully automatic control panel should comply with NFPA99/HTM0201/ISO 7396-1 standard. It shall be fully automatic, including shifting to secondary bank when the service bank is exhausted, with automatic reset of replaced bank to primary status. Semi-automatic manifolds are not acceptable. The manifold control(s) shall incorporate:Make AKTIV /Raj Med / HSIPL / Becon Medeas / Greggorson / Amico / Penlon. | ||
| 3 | Pressure transducer to actuate designated signals when service bank is exhausted. | ||
| 4 | Visible display on control unit to determine when primary bank is exhausted, and the secondary bank is in operation. A continuously lit green indicator to indicate header in use. | ||
| 5 | HMI touch Screen to indicate contents of each header. |
8 Days Left