Tendering Authority: Ropeway And Rapid Transport System Development Corporation HP Limited
Tender ID3819136
Organisation NameRopeway And Rapid Transport System Development Corporation HP Limited
Tender BriefCorrigendum : Construction/installation Of Elevator/public Lift And Foot Over Bridge From Sarwari To Sultanpur In District Kullu Hp (sh Site Development Work Thereof).
Last Date For Submission4th Apr, 2026
Opening Date04 Apr, 2026
Cost
Document Cost590.00
EMD38000.00
Estimated Cost1882532.00
Location
CityShimla
StateHimachal Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Ordinary rock163.50cum
2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 cement : 4 sand coarse:8 graded stone aggregate 40mm nominal size) For lift well base2.50cum
3Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete196.91sqm
4Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.Add for using extra cement in the items of design mix over and above the specified cement content therein. Note:-Cement content in this item is@330kg/cum Excess/less cement over the specified cement content used as per design is payable /recoverable separately) and Providing M-30 grade concrete instead of M- 25 grade BMC/ RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum)81.64cum
5Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars Thermo-Mechanically Treated bars of grade Fe-500D or more9606.00KG