Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3341933 |
|---|---|
| Organisation Name | Border Roads Organisation |
| Tender Brief | Corrigendum : P And L Of 75 Mm Tk Wmm Each In 2 Layers Km 00 To Km 3pt 75 Mm Tk Dbm And 40 Mm Tk Bc For Surf Rd Surf Aply Pc And Tc And Rd Mrkng Bet Km 00 To Km 2pt500 Particular Morth Specn Pong Op Hill Rd Km 00 Considered At Pong Udr 108 Rcc759tf In Hp |
| Last Date For Submission | 4th May, 2026 |
| Opening Date | 05 May, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 494670.00 |
| Estimated Cost | 41967000.00 |
| City | Shimla |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Altitude Between (Below 5101-5400 ) mtr | ||
| 2 | Providing, laying, spreading and compacting graded stone aggregate grading as per Table-400-13 and satisfying the physical reqmt as per Table No. 400-12 of MORT&H specifications for WMM specifications to a thickness of 75 mm (Each in Two layer), including premixing the material with water to OMC in mechanical mix (Pug Mill) laying in uniform layers in sub base/base course on a well prepared base and compacting with power vibratory roller to achieve the desired density including guarding. (WMM 75 MM Thick X 2 layer = 24927.84 Sqm) | 24927.84 | Sqm |
| 3 | Providing, laying and compaction of DBM 75 mm thick (compacted) over finished non bituminous layer/WMM layer with minimum 4.5% Bitumen (VG-10) content to total mix conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification. | 9717.75 | Sqm |
| 4 | Providing and applying primer coat on prepared WMM surface including cleaning of road surface and spraying bitumen emulsion (SS-1 grade) @ 7.50 Kg/10Sqm using bitumen pressure distributor conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification. | 9717.75 | Sqm |
| 5 | Providing, laying and compaction of BC 40 mm thick (Compacted) over finished Bituminous surface/DBM layer with minimum 5.4% Bitumen (VG-10) content to total weight of mix conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification. | 9717.75 | Sqm |
46 Days Left