Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4024277 |
|---|---|
| Organisation Name | Himachal Pradesh Tourism Development Corporation |
| Tender Brief | Corrigendum : Rafting Complex And Way Side Amenities At Nadaun , District Hamirpur, Himachal Pradesh |
| Last Date For Submission | 15th May, 2026 |
| Opening Date | 15 May, 2026 |
| Document Cost | 5000.00 |
|---|---|
| EMD | 63000000.00 |
| Estimated Cost | 0.00 |
| City | Shimla |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | A) RAFTING CUM WATER PARK COMPLEX AT NADAUN DISTT HAMIRPUR (H.P) Banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., including all leads and lifts of materials in foundation and plinth and as per direction of Engineer -in -charge. Dumping site/disposal site shall be arranged by the contractor at its own cost and nothing shall be paid extra. | 199.22 | Per Cubic metre |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth including all leads and lifts of materials in foundation and plinth and as per direction of Engineer -in -charge. Dumping site/disposal site shall be arranged by the contractor at its own cost and nothing shall be paid extra. | 1455.92 | Per Cubic metre |
| 3 | Earth work in excavation by mechanical means (hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5m in width or 10sqm on plan including dressing of sides and ramming of bottoms upto all lifts including getting out the excavated soil and disposal including all leads and lifts of materials in foundation and plinth and as per direction of Engineer -in -charge. Dumping site/disposal site shall be arranged by the contractor at its own cost and nothing shall be paid extra. | 1881.99 | Per Cubic metre |
| 4 | Filling available excavated earth ( Excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, including all leads and lifts of materials in foundation and plinth and as per direction of Engineer -in -charge. | 360.00 | Per Cubic metre |
| 5 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto all lead also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc including all leads and lifts of materials in foundation and plinth and as per direction of Engineer -in -charge. | 1953.00 | Per Cubic metre |