Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3933883 |
|---|---|
| Organisation Name | Bus Stands Management And Development Authority |
| Tender Brief | Corrigendum : Sh Construction Of Gi Sheet Cover For 4 Nos Fast Charger Dug Ware House At Hrtc Work Shop Local Dhalli And Rural Dhalli Distt. Shimla Hp Providing And Laying C.c 100mmthick Paver Flooring In Work Shop Yard Etc |
| Last Date For Submission | 7th May, 2026 |
| Opening Date | 07 May, 2026 |
| Document Cost | 8260.00 |
|---|---|
| EMD | 582500.00 |
| Estimated Cost | 41791983.00 |
| City | Shimla |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within within all leads as per direction of Engineer-in-charge. In cement mortar (Usefull Bricks may be handed over to the Deptt.), including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | 34.22 | Per Cubic Meter |
| 2 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within all leads of : G.S. Sheet (Usefull material like G.S. Sheet , ridges, hips, valleys and gutters etc may be handed over to the Deptt.), including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | 1848.50 | Per Square Meter |
| 3 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within all leads. (Dismantled usefull material like angles, tees, flats and channels including all gusset plates etc. may be handed over to the Deptt.), including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | 27991.20 | Per Kilogram |
| 4 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading up to approved dumping site, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | 5613.25 | Per Cubic Meter |
| 5 | Cutting in earth work by mechanical/manual means in all heights and depths in all kinds of soils, including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soils including, dewatering wherever required, setting out to required lines, levels as shown on the drawing and directed by the engineer -in-charge at site., according to the HP.PWD. specification of 1990 and sorting out useful and unuseful materials and transportation of the unuseful materials for disposing at dumping site (To be arranged by the contractor) as per satisfaction of Engineer- in -charge through all modes of transportation including head load, and mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour ( if required ). All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation and used /removed as per the direction of the Engineer - in- charge. Any loss to the public and private propriety during the course of execution and disposal of all surplus excavated earth/soil upto approved dumping site, which shall be arranged by the contractor at his own, and shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 5856.78 | Per Cubic Meter |
9 Days Left