| Tender ID | 4078642 |
|---|---|
| Organisation Name | Himachal Pradesh Tourism Development Board |
| Tender Brief | Proposed Construction Of Protection Wall For Dtdo Building At Nahan, H.p. |
| Last Date For Submission | 28th Apr, 2026 |
| Opening Date | 28 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 37455.00 |
| Estimated Cost | 1872749.00 |
| City | Shimla |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth iincluding carriage of material up to all leads and lifts and as per direction of Engineer incharge dumping site/disposal site shall be arranged by the contractor at he own cost and nothing shall be paid extra. All kinds of soil | 108.26 | Per Cubic Meter |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth including carriage of material up to all leads and lifts and as per direction of Engineer incharge dumping site/disposal site shall be arranged by the contractor at he own cost and nothing shall be paid extra. Ordinary rock | 46.40 | Per Cubic Meter |
| 3 | Stone /Boulder filling under floor /back fill dry hand packed including carriage of material upto all leads and lifts and as per direction of Engineer incharge. | 56.15 | Per Cubic Meter |
| 4 | Filling available excavated earth (including rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, including carriage of material up to all leads and lifts and as per direction of Engineer incharge. | 86.60 | Per Cubic Meter |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) including carriage of material up to all leads and lifts and as per direction of Engineer incharge. | 6.50 | Per Cubic Meter |