Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Himachal Pradesh Tourism Development Board
Tender ID4078642
Organisation NameHimachal Pradesh Tourism Development Board
Tender BriefProposed Construction Of Protection Wall For Dtdo Building At Nahan, H.p.
Last Date For Submission28th Apr, 2026
Opening Date28 Apr, 2026
Cost
Document Cost500.00
EMD37455.00
Estimated Cost1872749.00
Location
CityShimla
StateHimachal Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth iincluding carriage of material up to all leads and lifts and as per direction of Engineer incharge dumping site/disposal site shall be arranged by the contractor at he own cost and nothing shall be paid extra. All kinds of soil108.26Per Cubic Meter
2Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth including carriage of material up to all leads and lifts and as per direction of Engineer incharge dumping site/disposal site shall be arranged by the contractor at he own cost and nothing shall be paid extra. Ordinary rock46.40Per Cubic Meter
3Stone /Boulder filling under floor /back fill dry hand packed including carriage of material upto all leads and lifts and as per direction of Engineer incharge.56.15Per Cubic Meter
4Filling available excavated earth (including rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, including carriage of material up to all leads and lifts and as per direction of Engineer incharge.86.60Per Cubic Meter
5Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) including carriage of material up to all leads and lifts and as per direction of Engineer incharge.6.50Per Cubic Meter
28th Apr, 2026

4 Days Left

WhatsApp