Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4122890 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Providing And Fixing Rain Shelter Balance Work Therein |
| Last Date For Submission | 6th May, 2026 |
| Opening Date | 06 May, 2026 |
| Document Cost | 350.00 |
|---|---|
| EMD | 6100.00 |
| Estimated Cost | 0.00 |
| City | Shimla |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Steel work welded in built up sections, trusses and framed work including cutting hoisting fixing in position and applying a priming coat of red lead paint including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (a) In gratings, framed guards bars ladders, railing, brackets and similar work. ornamental work. | 418.20 | Per Cubic Metre |
| 2 | Providing and fixing M.S. BP Sheet 2mm thick in eaves board. Facia/ soffits/ ceiling including cutting, fixing and welding to steel roof members and applying a coat of red lead primer (Base members of steel work shall be measured & paid separately) including carriage of materials through all modes of transportion with in all leads and lilfts as per HP. PWD. specification of 1990 volume-I and as per direction of Engineer-in-Charge. | 17.91 | Per Cubic Metre |
| 3 | Providing and fixing 0.47mm to 0.50mm thick (Zero point thirty seven milimeter) thick prepainted steel both side green in partition with hot dipped metallic zinc coated sheet with top coat of regular modified polyster (RNP) organic ting of 20 micrones over 5 microne primer coating to back coat of polyster of 5 microns over a micrones primer i/c fixing with self drilling screws 55mm size with prepainted it and rubber washer complete with all accessories as required as per the directions of Engineer-in-Charge make TATA Dura shine | 16.52 | Per Cubic Metre |
| 4 | Providing and fixing high pressure laminated ( HPL ) sheet compose of a resin impregnated malamine overlay , bended at high pressure and temprature ( mddium density ) 12 on frame work of GI section in ceiling and dado including all fittings of required wooden shade and colours as per required at site as per approved design as as per the direction of E- In -C | 22.41 | Per Cubic Metre |
| 5 | Stone work in plain ashlar in super structure up to floor five level in cement mortor 1:6 including pointing with cement mortor 1:2 ( 1 cement 2 stone dust ) with as admixture of pigment matching the stone shade one face dressed Barog stone including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. | 0.49 | Per Running Metre |
7 Days Left