Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: NHPC Limited
Tender ID4845794
Organisation NameNHPC Limited
Tender BriefCorrigendum : Exploratory Drilling Works Of 380m Length (03 Nos. Holes At 60m Each And 01 No. Hole At Min 200m) At Left And Right Banks Of Usmsp At Parong Dam Axis
Last Date For Submission27th Jul, 2026
Opening Date01 Aug, 2026
Cost
Document Cost1180.00
EMD176000.00
Estimated Cost8787751.00
Location
CitySiang
StateArunachal Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Transportation cost of Drilling equipment like Machines, Pumps and accessories by 10 T capacity motor vehicles including loading, unloading and security etc. complete upto Parong Dam Site as per directions of Engineer-in-charge.6.000Job
2Making Approach Path and Cutting of Steps in hilly terrain including cost of labour and T&P complete. For 3.0 m wide path22.000per 100m length
3Dismantling, transportation and assembling of Drilling Machines of different capacity complete by head load including cost of labour, T&P, etc as per directions of engineer-in-charge. Up to 500 m lead.3.000Each Machine
4Carrying out of Diamond Core Drilling in NX size in different formations and at locations other than under water not involving construction of floating platform including preservation of cores in core boxes of standard dimensions made of seasoned local wood as per BIS standards, their marking and taking colour photographs of the preserved cores etc complete with cost of all labour, T&P and POL as per directions of engineer-in-Charge. In hard rock formation upto 100m depth280.000mtr
5Carrying out of Diamond Core Drilling in NX size in different formations and at locations other than under water not involving construction of floating platform including preservation of cores in core boxes of standard dimensions made of seasoned local wood as per BIS standards, their marking and taking colour photographs of the preserved cores etc complete with cost of all labour, T&P and POL as per directions of engineer-in-Charge. In hard rock formation beyond 100 m and up to 300 m depth.100.000mtr
27th Jul, 2026

6 Days Left

WhatsApp