Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4857320 |
|---|---|
| Organisation Name | NHPC Limited |
| Tender Brief | Exploratory Drilling Works Of 380 M Length (03 Nos. Holes At 60m Each And 01 Hole At Min 200m) At Left And Right Banks Of Usmsp At Uggeng Dam Axis |
| Last Date For Submission | 21st Jul, 2026 |
| Opening Date | 27 Jul, 2026 |
| Document Cost | 1180.00 |
|---|---|
| EMD | 177000.00 |
| Estimated Cost | 8818276.00 |
| City | Siang |
|---|---|
| State | Arunachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Transportation cost of Drilling equipment like Machines, Pumps and accessories by 10 T capacity motor vehicles including loading, unloading and security etc. complete upto Parong Dam Site as per directions of Engineer-in-charge. | 6.000 | Job |
| 2 | Making Approach Path and Cutting of Steps in hilly terrain including cost of labour and T&P complete. For 3.0 m wide path | 22.000 | per 100m length |
| 3 | Dismantling, transportation and assembling of Drilling Machines of different capacity complete by head load including cost of labour, T&P, etc as per directions of engineer-in-charge. Up to 500 m lead. | 3.000 | Each Machine |
| 4 | Carrying out of Diamond Core Drilling in NX size in different formations and at locations other than under water not involving construction of floating platform including preservation of cores in core boxes of standard dimensions made of seasoned local wood as per BIS standards, their marking and taking colour photographs of the preserved cores etc complete with cost of all labour, T&P and POL as per directions of engineer-in-Charge. In hard rock formation upto 100m depth | 280.000 | mtr |
| 5 | Carrying out of Diamond Core Drilling in NX size in different formations and at locations other than under water not involving construction of floating platform including preservation of cores in core boxes of standard dimensions made of seasoned local wood as per BIS standards, their marking and taking colour photographs of the preserved cores etc complete with cost of all labour, T&P and POL as per directions of engineer-in-Charge. In hard rock formation beyond 100 m and up to 300 m depth. | 100.000 | mtr |
14 Days Left