Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Uttar Pradesh Power Transmission Corporation Limited
Tender ID4261591
Organisation NameUttar Pradesh Power Transmission Corporation Limited
Tender BriefCorrigendum : Replacement Of Damaged Gaskets And Overhauling Oltc/diverter Switch Of 40mva T/f-ii (ngef Make, Mfg. Year 1998) Alongwith Other Associated Works At 132kv Sub Station Naugarh Under Etd-ii Basti H.q At Siddharthnagar
Last Date For Submission28th May, 2026
Opening Date29 May, 2026
Cost
Document Cost590.00
EMD4000.00
Estimated Cost0.00
Location
CitySiddharthnagar
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1The following works are carried out for Replacement of Gaskets of 40MVA T/F-II (NGEF make) alongwith other associated Works at 132KV Sub Station Naugarh, with all Cost of Men, Misc. Consumables, Crane / Hydra, Centrifuging Machine, Normal & Special T&Ps, etc. Required for Satisfactory Completion of the Job, as per Technical Specifications & Direction of the Supervising Engineer, as per Details below :
2Carriage of 20/40 KL empty oil tank for the centrifuging of T/F oil where it is available within distance of 50 Km Approx. including carefully loading empty oil tank at 220KV Substation Bansi & unloading at 132KV Substation Naugarh.1Job
3Removal of Jumpers of HV & LV side Bushings of the Transformer. The Scope of Work Involves Opening of Bolts & Nuts and Removal of Jumpers, Bushing Clamps etc.1Job
4Complete Draining of the T/F Oil from the 40MVA Transformer - II (NGEF make) into Oil Tanker / Oil Drums and Stacking them at Proper Place.16590Lit.
5Complete Dismantling of the 40MVA Transformer-II (NGEF make). The Scope of Work Involves Dismantling of HV / LV / Neutral Bushings, Turrets, Radiators, Conservator Tank, Explosion Vent Pipe, Buchholz Relay, Oil Pipe Lines, Flanges, Valves, Cooling Fans etc. along with Opening of associated Electrical Connections, Stacking of all the Dismantled Parts at Proper Place in the Switchyard including Proper Blanking of the Open Points before Replacement of Gaskets.1Job
28th May, 2026

7 Days Left

WhatsApp