Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Health Engineering Department
Tender ID4897072
Organisation NamePublic Health Engineering Department
Tender BriefCorrigendum : Annual Rate Contract For Construction And Commissioning Of 200 Mm Dia 03 Phase Tubewell With 5 Year Operation And Maintenance Including 2 Years Defect Liability Period Under Division Sikar Of Phed, Circle Sikar District-sikar
Last Date For Submission17th Aug, 2026
Opening Date18 Aug, 2026
Cost
Document Cost2000.00
EMD600000.00
Estimated Cost30000000.00
Location
CitySikar
StateRajasthan

Register to see full details

BOQ Items
#ItemQtyUnits
1Construction of tube well from ground level & up to 100 mtr depth to accommodate housing and assembly pipe of following sizes in all type of alluvium strata unconsolidated formation such as pebbles, boulders etc. by percussion/rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications, with gravel as per IS:4097-1967 and it's packing as per IS: 2800 (Part I & II) 1979 as amended up to date (the work includes the cost of gravel & it's primary packing and packing during development, lowering of housing & strainer assembly pipes with supply and wrapping of coir-rope, wherever necessary for arresting fine sand particles and development work, but excluding the cost of housing and strainer pipe assembly). The work would be completed after obtaining sand free water. (Rates are exclusive of GST)
2Nominal bore 200 mm dia.1.0Mtr
3Add 15% extra on above item (Item no 2) for drilling depth beyond 100 mtr and up to 200 mtr, rate shall be applicable for only extra depth beyond 100 mtr and up to 200 mtr.1.0Mtr
4Add 40% extra on above item (Item no 2) for drilling depth beyond 200 mtr, rate shall be applicable for only extra depth beyond 200 mtr .1.0Mtr
5Construction of Tube Well from ground level and up to 100 mtr. depth to accommodate housing and assembly pipe in all type of alluvium strata, unconsolidated formation such as pebbles, boulders etc. by percussion/ rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications for removal of overburden. The work includes the cost of lowering of casing pipe, but excludes the cost of casing pipe. (Rates are exclusive of GST)
17th Aug, 2026

13 Days Left

WhatsApp