| Tender ID | 3925450 |
|---|---|
| Organisation Name | Local Self Government Department |
| Tender Brief | Corrigendum : Construction Of Cc Road Vijay Raj Hotel To Rajhans Water Alam Denter Ke Guli Gurjar Ke Chai Ke Duka To Shivpal Ji Nagaa Milan Sharma Ke Ghar Ke Right Side Anwar Ji Ke Ghar Tak And Adjoining Street And Chamber Raising Work Wn 45 |
| Last Date For Submission | 20th Apr, 2026 |
| Opening Date | 21 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 82540.00 |
| Estimated Cost | 4127000.00 |
| City | Sikar |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Construction of CC Road Vijay Raj Hotel To Rajhans Water Alam Denter Ke Guli Gurjar Ke Chai Ke Duka To Shivpal Ji Nagaa Milan Sharma Ke Ghar ke Right Side Anwar Ji Ke Ghar TK& Adjoining Street & Chamber Raising Work WN 45 | ||
| 2 | Earth work in excavation for roadway, including trimming bottom and sid slopes in accordance with requirement of line, grades and crosssections, including disposal of surplus material with all lift and leadupto 1000 metre as per MoRT&H specification clause 301 | 818.75 | p.cum |
| 3 | Dismantling of existing structures like culverts, bridges,retainingwalls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with alllifts and lead of 50 metres as directed by Engineer. ramps | 4.73 | p.cum |
| 4 | Construction of embankment with approved materials deposited at site available from roadway cutting and excavation from drain and foundation of other structures, graded and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 as per MoRT&H specification clause 305. | 818.75 | p.cum |
| 5 | Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) | 472.50 | p.cum |