Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID3776678
Organisation NamePublic Works Department
Tender BriefCorrigendum : Additional Works In Connection With Proposed 50 Bedded Critical Care Block G3 Storied At North Bengal Medical College Siliguri Electrical Works Supply, Installation, Testing and Commissioning Of Substation Works
Last Date For Submission24th Apr, 2026
Opening Date27 Apr, 2026
Cost
Document Cost1000.00
EMD380271.00
Estimated Cost19013564.00
Location
CitySiliguri
StateWest Bengal

Register to see full details

BOQ Items
#ItemQtyUnits
1SUB-HEAD I : SITC OF VCB PANEL, TRANSFORMER & LT PANEL
2VCB PANEL
3Supply, Installation, testing & Commissioning of 11 KV 800 A, short-circuit capacity of 26.3 KA for 1 sec, 3-panel HT Gear with VCBs. The Vacuum Circuit Breaker should comply as per IS:13118& IEC:62271-100 for Circuit Breaker & IS:3427 & IEC:62271-200/IEC 694, IEC-61850 for Indoor panel. The HT panel is rated at 11 KV, 3-Phase 800A, Breaking Current/short-circuit capacity of 26.3kA for 1 sec, 50c/s and shall be of floor-mounting, sheet steel clad, free-standing metal enclosed air insulated switchgear cubicle with VCB inside.
4The Vacuum Circuit Breaker is horizontal isolation & horizontal draw out/Vertical isolation & horizontal draw out with 3 compartments and is made of 2mm CRCA sheet for load bearing members with vermin & moisture proof along with automatic shutter arrangement for complete isolation of bars, cable sockets & other live parts etc. when the removable portion is withdrawn.
5The breaker is arranged for hand operation through front of the panel push buttons & spring charging mechanism and also electrical motor which will be energized by 230V AC. Closing and tripping coils are rated for 110V DC to be made available from the station 400 V 3 phase 50 C/s A.C. source with remote operation compatibility. All trip coils shall be of shunt trip type energized from a suitable rectifier condenser source supply is required. There is a remote operation through multi core arrangement for closing & tripping. The shutter shall be gravity operated.
24th Apr, 2026

13 Days Left

WhatsApp