Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4448006 |
|---|---|
| Organisation Name | Building Construction Department |
| Tender Brief | Proposed Construction Of Weigh Bridge And Operator Room With 1000 Mt Godown At Thethaitangar Simdega, Jharkhand. |
| Last Date For Submission | 5th Jun, 2026 |
| Opening Date | 08 Jun, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 290000.00 |
| Estimated Cost | 28901998.00 |
| City | Simdega |
|---|---|
| State | Jharkhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. | 878.732 | CUM |
| 2 | Extra for earthwork in hard soil as per specification and direction of E/I. ( vide classification of soil item-B) | 136.904 | CUM |
| 3 | Earth filling in foundaion trenches and plinth in layers not exceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume) | 326.610 | CUM |
| 4 | Filling in foundation trenches and plinth in layers. Not exceeding 150 mm thick well watered, rammed fully compacted and fine dressed with earth obtained after cutting within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I (Mode of measurement compacted volume) | 782.093 | CUM |
| 5 | Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume) | 86.033 | CUM |
5 Days Left