Tendering Authority: Rural Development Department
Tender ID4832270
Organisation NameRural Development Department
Tender BriefConstucting Bandhara At Salel Kulkarwadi No.1 Kardacha Kond. Tal- Malvan. Dist- Sindhudurg.
Last Date For Submission17th Jul, 2026
Opening Date20 Jul, 2026
Cost
Document Cost1000.00
EMD14000.00
Estimated Cost1122211.00
Location
CitySindhudurg
StateMaharashtra

Register to see full details

BOQ Items
#ItemQtyUnits
1Clearing cutting throny hrubs bushes, grass to a distance of 15 m. and 1.50mtr. Lead & lift upto 1.50m.650.00Smt
2Excavation in all kinds of soil, soft murum, incl boulders upto 0.60m diametre (0.113cum.) for canal,seating of emabankment, filter drain/catch water drains etc.. And placing the ecaxavated material neatlyy in dump area or for formtion of service road as directed incl. cost of ll materials. machinery, labour, dressing bed nd sides to required level and profile etc. comp. with lead up to 15m and lift 6.00m etc. comp.118.03Cmt
3Excavation in hard murum, incl boulders upto 0.60m diametre (0.113cum.) for canal,seating of emabankment, filter drain/catch water drains etc.. And placing the ecaxavated material neatlyy in dump area or for formtion of service road as directed incl. cost of ll materials. machinery, labour, dressing bed nd sides to required level and profile etc. comp. with lead up to 15m and lift 6.00m etc. comp.68.16Cmt
4Excavation in soft rock without blasing incl. boulders upto 0.60m diametre (0.113cum.) for canal,seating of emabankment, filter drain/catch water drains etc.. And placing the ecaxavated material neatlyy in dump area or for formtion of service road as directed incl. cost of ll materials. machinery, labour, dressing bed nd sides to required level and profile etc. comp. with lead up to 15m and lift 6.00m etc. comp.68.16Cmt
5Excavation in hard rock of all toughness including boulders above 0.6 m dia.(0.113Cum) for canals cut-off trench of embankment filter/catch water drains and other appurtenant structures by control blasting methods including control of vibrations by use of delay detonators and control of fly rocks by muffling arrangements and adopting only jack hammers for drilling holes and minimizing damage to side slopes of canal in water prism area by adopting any one or combination of line drilling /presplitting /smooth blasting techniques including cost of all materials, machinery, labour, placing excavated rock neatly approved dump area as directed etc. complete with leads as below and all lifts as directed.22.72Cmt
17th Jul, 2026

13 Days Left