Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4072523 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Construction Of Bargawan-waidhan Main Road (mdr) Naugarh To Medical College 2-lane Cc Road Length Of 2.60 Km, Block Waidhan District Singrauli Mp |
| Last Date For Submission | 8th May, 2026 |
| Opening Date | 11 May, 2026 |
| Document Cost | 20000.00 |
|---|---|
| EMD | 885040.00 |
| Estimated Cost | 98503842.00 |
| City | Singrauli |
|---|---|
| State | Madhya Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | 2.2 Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees having girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness. A In area of light jungle | 2.6000 | Hect |
| 2 | Dismantling of Cement Concrete Pavement Dismantling of cement concrete pavement by mechanical meansusing pneumatic tools, breaking to pieces not exceeding 0.02 cum involume and stock piling Serviceable material at designated locationsand disposal of unserviceable materials up to a lead of 1000 meters, | 1008.00 | Hect |
| 3 | 3.3 Excavation in Soil using Hydraulic Excavator and Tippers with disposal up to 1000 meters. Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting suitable earth to the embankment location and disposing off unsuitable earth with all lifts and lead up to 1000m as per relevant clauses of section-300 of specification. | 936.580 | Cum |
| 4 | 3.13 Embankment/ Sub Grade Construction with Material Obtained from Borrow Pits Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per relevant clauses of section-300. | 14662.840 | Cum |
| 5 | 3.14 Construction of Embankment with Material Deposited from Roadway Cutting Construction of embankment with approved materials having CBR>7 deposited at site from roadway cutting and excavation from drain or foundation of structures graded and compacted to meet requirement of table 300-1, 300-2 and as per relevant clauses of section-300. | 936.580 | Cum |
14 Days Left