| Tender ID | 4122868 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | (sh Providing And Laying 30mm Thick Bituminous Concrete In Km 0/0 To 4/00)under Pdna 2023 |
| Last Date For Submission | 4th May, 2026 |
| Opening Date | 05 May, 2026 |
| Document Cost | 2000.00 |
|---|---|
| EMD | 110500.00 |
| Estimated Cost | 5512497.00 |
| City | Sirmaur |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Removal of land slides /slips clearence . Removal of land slide in hilly area in ordinory rock not require blasting by mechanical means including cutting and trimming of slops and disposal of cut material with in a left upto 1.5mtr and land up to 1000meter as per technical specification 302.3.5 abd 1611. including carriage of material in all leads and lifts as per the direction of the Engineer- In- charge. | 4815.75 | Per cubic metre |
| 2 | Providing and applying tack coat with bitumen emulsion ( RS-1) using emulsion distributor @ 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer and cleaned with hydraulic broom as per Technical specification Clause 503 ,including carriage of all labour equipment and material to various location through all modes of transportation in all leads and lifts, including all incidental charges. | 13420.00 | Per Square metre |
| 3 | Providing and laying 30 mm( Thirty thick bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes(Seventy five tonnes) per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, antistripping agent @ 0.1% of bituminous binder ( as per I.S. 14982/2017 clause 5.2 in accordance with I.S. 6241) & transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects,,including carriage of all labour equipment and material to various location through all modes of transportation in all leads and lifts, including all incidental charges. | 402.60 | Per cubic metre |