Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3817636 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Construction Of State Of Art Model De-addiction And Rehabilitation Centre At Kotla Barog District Sirmour (h.p) (sh- Construction of Building Portion Civil Work, Water Supply And Sanitary Installation Construction Of Rain Water Harvesting Tank, , Soak Pit |
| Last Date For Submission | 1st Apr, 2026 |
| Opening Date | 01 Apr, 2026 |
| Document Cost | 40000.00 |
|---|---|
| EMD | 4444200.00 |
| Estimated Cost | 0.00 |
| City | SIRMOUR |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains including dressing of sides and ramming of bottoms, lift upto any height, including getting out the excavated soil and disposal of surplus excavated soil within all leads & lifts.In all kinds of soil and sorting useful and un useful material and transportation by the un- useful material for dispring at dumping site (to be arrangend by the contractor) as on stasifaction of Engineer -in charge including all modes of transportation i/c head load animal load or material means along with its levelling fine dressing and with all kinds of labour,machinries,tools equipment and safety measures and incidential necessary to complete the work by mechanical means and labour (if required) .any lose to the puplic and private property during the course of excavation and disposal of serviceable and un serviceable material shall be the absolute resposibilty by the contractor and shall have to be duly compensated by him in all respect i/c all incidential charges. | 5384.65 | Per cubic metre |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. including carriage of all labour equipments and materials to various location through all modes of transportation upto all leads, lifts and other incidential charges. | 350.33 | Per cubic metre |
| 3 | Providing form work with steel plates 3.15mm(three point one five millimetre) thick welded with angle iron in frame 30x30x5mm ,so as to give a fair finish including centring ,shuttering ,strutting and propping etc. with wooden battens and ballies , height of propping and centring below supporting floor to ceiling up to all heights and removal of the same for insitu-reinforced concrete & plain concrete work inCentering and shuttering including strutting, propping etc and removal of the form for Foundation footing and basis of columns, etc. and mass concrete. including carriage of all labour equipments and materials to various location through all modes of transportation upto all leads, lifts and other incidential charges. | 1479.34 | Per square metre |
| 4 | Providing form work with steel plates 3.15mm(three point one five millimetre) thick welded with angle iron in frame 30x30x5mm ,so as to give a fair finish including centring ,shuttering ,strutting and propping etc. with wooden battens and ballies , height of propping and centring below supporting floor to ceiling up to all heights and removal of the same for insitu-reinforced concrete & plain concrete work inCentering and shuttering including strutting, propping etc and removal of the form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.including carriage of all labour equipments and materials to various location through all modes of transportation upto all leads, lifts and other incidential charges. | 606.34 | Per square metre |
| 5 | Providing form work with steel plates 3.15mm(three point one five millimetre) thick welded with angle iron in frame 30x30x5mm ,so as to give a fair finish including centring ,shuttering ,strutting and propping etc. with wooden battens and ballies , height of propping and centring below supporting floor to ceiling up to all heights and removal of the same for insitu-reinforced concrete & plain concrete work inCentering and shuttering including strutting, propping etc and removal of the form for Flat surfaces such as soffits of suspended floors, roofs, landings and the like :including carriage of all labour equipments and materials to various location through all modes of transportation upto all leads, lifts and other incidential charges. | 7247.34 | Per square metre |
2 Days Left