Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4853619 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Name Of Work Special Repairs To Percolation Tank No.2 Shejbabhulgaon (17.709955 75.610482) Taluka Mohol Dist Solapur |
| Last Date For Submission | 13th Jul, 2026 |
| Opening Date | 15 Jul, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 0.00 |
| Estimated Cost | 1388596.00 |
| City | Solapur |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Item No.01 : Cleaning grass and removal of rubbish , including all lead and depositing outside the periphery of the area as directed, including 1 % Cess for labour welfare etc. complete | 12941.00 | Sq m |
| 2 | Item No.02 : Excavation in all kinds of Soils & Soft murum including boulders up to 0.6 m diameter (0.113cum) for COT / WW Bar & Flank Wall / Tail & Approach Channel and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile with all lead and lift. including 1 % Cess for labour welfare etc. complete . | 673.00 | Cum |
| 3 | Item No.03 : Excavation in Hard Murum including boulders up to 0.6 m diameter (0.113 cum) for COT / WW Bar & Flank Wall / Tail & Approach Channel and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile with all lead and lift. including 1 % Cess for labour welfare etc. complete . | 673.00 | Cum |
| 4 | Item No.04 : Excavation in Soft Rock without blasting including boulders up to 0.6 m diameter (0.113 cum) for COT / WW Bar & Flank Wall / Tail & Approach Channel and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile with all lead and lift. including 1 % Cess for labour welfare etc. complete . | 945.00 | Cum |
| 5 | Item No.05 : Providing cut off trench filling using selected impervious soil from approved borrow areas ( Government acquired land ) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, leveling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compacter including cost of water with all lead and lift excluding royalty charges including 1 % Cess for labour welfare etc. complete . |
6 Days Left