Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4189545 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair/replacement Of Road Sign Board, Road Marking, Road Furniture And Cross Drainage Works At Naa Under Ge (n) Tezpur |
| Last Date For Submission | 2nd Jun, 2026 |
| Opening Date | 08 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 40000.00 |
| Estimated Cost | 2000000.00 |
| City | Sonitpur |
|---|---|
| State | Assam |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | M&L for 75mm thick (Compacted thickness) WBM, with coarse aggregate of grading 2(63 to 40mm size) with Limstone, sandstone flint or quartzite, spread, rolled and consolidation to gradient and camber required with 8 to 10 tonne power roller complete all as specified and directed. | 5.00 | Per X Sqm |
| 2 | Preparing unsurfaced water bound macadam by brushing with wire brushes for removing caked mud etc sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. complete all as specified and directed. | 5.00 | Per X Sqm |
| 3 | M&L for applying evenly a priming/tack coat with RS1 grade catonic emulsion @ 7.5 Kg per 10 Sqm using mechanical sprayer on black top surfaces complete all as specified and directed | 5.00 | Per X Sqm |
| 4 | M&L for premix bituminous macadam 75mm or less consolidated thickness by using paving bitumen VG-30 grade with binder content @ 4% weight of total mix laying with mechanical pavewr rolled and compacted to required camber and gradient by using 8 to 10 tonne capacity poweer roller complete all as specified and directed Notes:- The contractor's quoted rates shall also be deemed to include the following elements: (i) The contractor shall get the mix design done through National Test House, SEMT wing CME, Regional Research Labs, IITs, National Institutes of Technology, Govt Engineering College or any Govt laboratories and the same shall be got approved from the GE before providing Bituminous Macadum. (ii) If actual design mix comes less than 4% binder content, then the rate of recovery of bitumen shall be as per rate in purchase vouchers per kg for the purpose of adjustment. However, no adjustment shall be made if the binder content is required more than 4%. | 5.00 | Cum |
| 5 | M&L for preparation of old black bituminous top surfaces by brushing with wire brushes for removing caked mud etc. sweeping with brooms & finally fanning the cleaned surface with gunny bags to remove all loose dirt etc complete in all respect complete all as specified & directed | 180.00 | Per X Sqm |
6 Days Left