Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4276133 |
|---|---|
| Organisation Name | Public Health Engineering Department |
| Tender Brief | Corrigendum : Repair, Maintenance And Operation Of Pump House And Tube Well Jen Section Riri - Ii Under Sub Dn. Rural Sridungargarh |
| Last Date For Submission | 21st May, 2026 |
| Opening Date | 22 May, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 49940.00 |
| Estimated Cost | 2497000.00 |
| City | Sridungargarh |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | PART A :- | ||
| 2 | Maintenance of pipelines irrespective of size & material which includes Repairing of Bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, Collection & recording minimum 10 nos. residual chlorine samples during daily supply timings, interconnections and all works related to pipeline network in existing distribution /rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of Black top, WBM & CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. For entire job contractor will use their own T & P. Contractor with his own resources shall arrange de-watering,JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipeline network within the scope of work for per km pipe line per month. Jointing material shall be provided by the department 51 km to 100 km - one fitter-II & Two beldar | 390 | per km per month |
| 3 | Maintenance of tubewells which includes round the clock monitoring of tubewells of all sizes, complete repairs / rewinding of submersible pump sets including cost of material components required to repair pumpsets, starters, meters etc. of electric panel of tube wells, Lowering and unlowering of pumpsets complete in all respect, maintenance of log-books & Histroy sheet as directed by Engineer-in-charge for tubewell per month. (For Rural Scheme where three phase electric supply is up to 8 hrs) | ||
| 4 | 16.0 HP to 25.0 HP | 30 | Each |
| 5 | 26.0 HP to 45.0 HP | 246 | Each |
Closed