Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Power Development Department
Tender ID4211196
Organisation NamePower Development Department
Tender BriefCorrigendum : Annual Stage Contract For Repair And Maintenance Of 33kv Lines Falling Under The Jurisdiction Of Sub Transmission Division-ist,bemina Srinagar For The Financial Year 2026-27 Valid Till Finalization Of The Next Stage Contract For The Year 2027-28.
Last Date For Submission8th Jun, 2026
Opening Date09 Jun, 2026
Cost
Document Cost1000.00
EMD30000.00
Estimated Cost0.00
Location
CitySrinagar
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Supply and Erection of 13 mtr Long ST Pole (ST-410SP-69) with base plate and top cap including excavation of pit and back filling by boulders upto 1ft (as per latest specification and drawings adopted and approved by the department) as per REC construction Standard1.000No
2Erection of 13 mtr Long ST Pole (ST-410SP-69) with base plate and top cap including excavation of pit and back filling by boulders upto 1ft (as per latest specification and drawings adopted and approved by the department) as per REC construction Standard, including loading, unloading ,transportation etc from Divisional Stores BEMINA to SITE1.000No
3Supply and Erection of 11mtr Long ST Pole (ST-410SP-56) with base plate and top cap including excavation of pit and back filling by boulders upto 1ft (as per latest specification and drawings adopted and approved by the department) as per REC construction Standard1.000No
4Erection of 11 mtr Long ST Pole (ST-410SP-56) with base plate and top cap including excavation of pit and back filling by boulders upto 1ft (as per latest specification and drawings adopted and approved by the department) as per REC construction Standard, including loading, unloading ,transportation etc from Divisional Stores BEMINA to SITE1.000No
5Supply and Erection of 9mtr Long ST Pole (ST-410SP-33) with base plate and top cap including excavation of pit and back filling by boulders upto 1ft (as per latest specification and drawings adopted and approved by the department) as per REC construction Standard1.000No
8th Jun, 2026

6 Days Left

WhatsApp