Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3260481 |
|---|---|
| Organisation Name | Power Development Department |
| Tender Brief | Corrigendum : Augmentation Of 132 By 33 Kv Gss Ljhp From 40 To 70 Mva Alongwith Providing Of New C And R Panels And Other Equipments At 132 By 33 Kv Grid Station Ljhp |
| Last Date For Submission | 11th Apr, 2026 |
| Opening Date | 13 Apr, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 2262920.00 |
| Estimated Cost | 113146000.00 |
| City | Srinagar |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | (A) SUPPLY:- Design, Manufacture, Supply, Packaging & Forwarding, Transportation, Delivery at site of equipments and materials. | ||
| 2 | Power Transformer | ||
| 3 | Design, Engineering, Manufacture, supply and Assembly of 3-Phase, 132/33 KV 50 MVA, Power Transformer Complete with all fittings and accessories required for efficient and trouble free operations of Transformer, Testing at Manufacture s works and Customer s Premises, Supply, Loading at Factory, Transportation and Delivery at site with OLTC, RTCC( With all its control and power cables including all other accessories required for its complete commissioning), SCADA Compatable, NIFPES ( with MS tank , control cables, power cables and other accessories including all Civil works which are required for its complete commissioning) , HV and LV Connectors, Turret based NCTs and other required accessories and fittings (complete Unit) including all the mandatory spares i.e 1. HV Bush =01 no 2. LV Bush =01 no. 3. HV Bushing Clamps =02 No. 4. LV Bushing Clamps =02 No. 5. Buckholz Relay =01 No 6. 3-Ph. Tr. Cooling Fan =02 No 7. 10A, 110V DC,2P MCB=06No 8. Phase Failure UV/OL Relay =2No 9. 32A, 3 Ph, 240VAC CONTACTOR with Add-on Contacts =03 No 10. Rotary Cam-Switch for Cooling Fans 3Way= 02 No. 12. Butter fly values = 02 No. 13. WTI meter = 01 No. 14. Pressure Relief Value = 01 No. 15. Silica Gel Cubicle = 01 No. 15. Transformer oil=5% of the T Oil required for Xmer 16. Set of gaskets =01 No. | 1.00 | NO |
| 4 | Structures | ||
| 5 | Fabrication, galvanisation, supply including packing and forwarding, transportation charges of 132 kV & 33 kV structures (each type) | 59.67 | MT |
13 Days Left