| 1 | Provision of complete consultancy services ( as listed below in Item No 1.00 to 1.80) as per relevent IS code practice and standard Engineering Norms and practices complete all as specified and as directed.
(a) Preparation, submission and finalization of Complete conceptual plans, Architectural Drawings (Site plans, Plans of all Buildings, all side elevations, Cut Sections, Various sections through Stairs, Critical sections, detailings showing internal fixtures, cupboards, kitchen details, toilet details, elevation feature details, Schedule of Finishes, Arch TD Drawings (in appropriate scales) in REVIT/AutoCad for Following Buildings, While preparing drawings the consultant shall adhere to scales of Accomodation , Scales of Furniture for built in furniture, Zonal specifications, IS Codes, NBC Codes, GRIHA rating system (for 3 Star rating) , Local Bye laws, BPs and AE-II of the subject work. All these documents can be obtained from the office of HQ CE 31 Zone on any working Day. In case of any discrepancy beteween these documents the decision of accepting officer will be obtained before finalizing the drawings. The above mentioned drawing shall be prepared in consultation/supervision of Architects of HQ CE 31 Zone (E-6 Section ) ,( E-2(Plg) Officers for Sch of Finishes ) and will have to approved by Accepting Officer before Finalization.
Special works: (i) Single living accn for 19 Havs and 65 OR's (S+4) Total plinth Area -2276.04 Sqm
(ii) Single living accn for 15 JCO's (G+2) including Stair case and baggage room Total plinth Area -644.16 Sqm
(iii) Single living accn for 09 Major and for 02 Capt (G+2) including servant qtrs, box room, attached toilet area and goods lift size etc Total plinth Area -860.14+148.64+51.56 = 1060.34 Sqm
Auth works:(i) Single living accn for 23 Havs and 189 OR's (S+4) including store room, beggage room, sanitary block Total plinth Area -5468.00 Sqm
(ii) Cook house and Dinning hall (S+4) for 42 Havs and 290 OR's (Total 332 Ors) Kitchen, meat room, dry store, fresh store etc Total plinth Area -728.08+324.18=1052.26 Sqm
(iii) Single living accn for 06 JCO's (G+2) including baggage room Total plinth Area -278.10 Sqm
(iv) JCO's Mess for 25 JCO's including mess room, club room, toilet etc Total plinth Area -359.8 Sqm
(v) Single living accn for 01 Capt (S/S) including servant qtrs, baggage room etc Total plinth Area - 65.91+18.58= 84.49 Sqm
(vi) Officer's Mess for 23 str of Officers including mess room, bar room, libarary, kitchen, mess office, silver room, guest room, wine store, plate room etc Total plinth Area - 881.90 Sqm
(vii) Office and Administration Accn (S+2) including Offrr's Mess for 23 str of Officers including , libarary, guest room, Driver room, Sanitary annex Total plinth Area - 1916.00 Sqm
(vii) MT Office and LRW office including sanitary annex Total plinth Area - 80.67+38.50= 119.17 Sqm
(ix) Guard house and ancillaries, URC (G+1), OR's institute, and Educational building (G+2) Total plinth Area - 162.00+267.46+158.03+690.40=1277.89sqm
(x) Religious Institute,Gd rest room for 02 NCOs and 06 ORs and lift (08 x passengers) Total plinth Area - 75.00+493.00+144.19= 712.19 Sqm
| 1.00 | Each Job |
| 2 | Note:-(i) All the above buildings shall be completely GRIHA COMPLIANT and shall include all the components, fittings and finishes to make the same completely compliant for GRIHA-3 Star Rating.
(ii) The Consultant before starting prepration of drawings shall submit detailed report in PPT form ,explaining methodology to be used to achieve GRIHA 3 star rating , based on all the documents mentioned in Para (a) above and considering the availaibility of local construction material and techniques used in zone including design and construction methodology to be adopted.
(iii) The consultant Shall be liable to carry out any amendments/modification/revision/additions/alterations in drawings as propposed by Accepting officer before finalization of the drawings.
(iv) The GRIHA registration charges shall be borne by the dept and rates quoted by Consultant are excluding the GRIHA registeration charges. The responsibility of registeration will rest with Consultant. He will be paid by GE on providing of receipt of registeration fee online through the department. The over all responsibility for GRIHA till completion of job will be of Consultant. '
(v) Signatures of GE and Users (through GE) shall be obtained on final layout and floor plans before preparation of detailed Arch/ Str Drawings.
(vi) Levelling/Contour Survey at 3 mtr interval (with approximate area of 110000 Sqm ) of the plot area shall be carried out by Consultant before finalizing layout of Bldgs and Services. Level sheet shall be submitted in quadrapulicate. The same shall be included in Quoted rates.
(vii) Being multi storied bldgs, the necessary fire clearance from CFEES or other Govt Agency is mandatory and the said provision has to be considered to be obtained by Consultant. | 1.00 | Each Job |
| 3 | (b) Preparation, submission and finalization of Complete structural design and drawings for following buildings based on the architectural drawings prepared and approved vide Item No 1 above, While preparing drawings the consultant shall adhere to design parameters given in Tender documents, scales of Accomodation , Scales of Furniture for built in furniture, Zonal specifications, IS Codes, NBC Codes, GRIHA rating system (for 3 Star rating) , Local Bye laws and BPs and AE-II of the subject work. All these documents can be obtained from the office of HQ CE 31 Zone on any working Day. In case of any discrepancy beteween these documents the decision of accepting officer will be obtained before finalizing the drawings., All these documents can be obtained from the office of HQ CE 31 Zone on any working Day.The above mentioned drawing shall be prepared in consultation/supervision of Design section officers of HQ CE 31 Zone (E-2 Design Section ) and will have to approved by Accepting Officer before Finalization.SBC report shall be provided by E-2(Des) Sec to consultant.for preparation of Str drgs.
Special works: (i) Single living accn for 19 Havs and 65 OR's (S+4) Total plinth Area -2276.04 Sqm
(ii) Single living accn for 15 JCO's (G+2) including Stair case and baggage room Total plinth Area -644.16 Sqm
(iii) Single living accn for 09 Major and for 02 Capt (G+2) including servant qtrs, box room, attached toilet area and goods lift size etc Total plinth Area -860.14+148.64+51.56 = 1060.34 Sqm
Auth works:(i) Single living accn for 23 Havs and 189 OR's (S+4) including store room, beggage room, sanitary block Total plinth Area -5468.00 Sqm
(ii) Cook house and Dinning hall (S+4) for 42 Havs and 290 OR's (Total 332 Ors) Kitchen, meat room, dry store, fresh store etc Total plinth Area -728.08+324.18=1052.26 Sqm
(iii) Single living accn for 06 JCO's (G+2) including baggage room Total plinth Area -278.10 Sqm
(iv) JCO's Mess for 25 JCO's including mess room, club room, toilet etc Total plinth Area -359.8 Sqm
(v) Single living accn for 01 Capt (S/S) including servant qtrs, baggage room etc Total plinth Area - 65.91+18.58= 84.49 Sqm
(vi) Officer's Mess for 23 str of Officers including mess room, bar room, libarary, kitchen, mess office, silver room, guest room, wine store, plate room etc Total plinth Area - 881.90 Sqm
(vii) Office and Administration Accn (S+2) including Offrr's Mess for 23 str of Officers including , libarary, guest room, Driver room, Sanitary annex Total plinth Area - 1916.00 Sqm
(vii) MT Office and LRW office including sanitary annex Total plinth Area - 80.67+38.50= 119.17 Sqm
(ix) Guard house and ancillaries, URC (G+1), OR's institute, and Educational building (G+2) Total plinth Area - 162.00+267.46+158.03+690.40=1277.89sqm
(x) Religious Institute,Gd rest room for 02 NCOs and 06 ORs and lift (08 x passengers) Total plinth Area - 75.00+493.00+144.19= 712.19 Sqm
| | |
| 4 | Note:-(i) All the above buildings shall be completely GRIHA COMPLIANT and shall include all the components, fittings and finishes to make the same completely compliant for GRIHA-3 Star Rating.
(ii) The Consultant before starting prepration of drawings shall submit detailed report in PPT form ,explaining methodology to be used to achieve GRIHA 3 star rating , based on all the documents mentioned in Para (a) above and considering the availaibility of local construction material and techniques used in zone including design and construction methodology to be adopted.
(iii) The consultant Shall be liable to carry out any amendments/modification/revision/additions/alterations in drawings as propposed by Accepting officer before finalization of the drawings. | | |
| 5 | (c) Prepration, submission and finalization of, Complete Mechanical, Electrical and B/R sevices drawings ( based on the architectural drawings prepared and approved vide Item No 1 above) (Site plan, Plans of all the buildings, multiple floor plans with details showing internal electric supply, external electric supply, external water supply , lighting plan and fixing site for panels and Hot Water supply, Area drainage plan, Road, Path/Culvert, Sewage Disposal Plan Sewage pipe line is to be connected with Septic Tanks/Soakage pits , (in appropriate scales) in REVIT/AutoCad for Following Buildings. While preparing drawings the consultant shall adhere to scales of Accomodation , Scales of Furniture for built in furniture , Zonal specifications, IS Codes, NBC Codes, GRIHA rating system (for 3 Star rating) , ECBC norms, Local Bye laws and BPs and AE-II of the subject work. In case of any discrepancy beteween these documents the decision of accepting officer will be obtained before finalizing the drawings. All these documents can be obtained from the office of HQ CE 31 Zone on any working Day.The above mentioned drawing shall be prepared in consultation/supervision of E/M officers of HQ CE 31 Zone (E-4 Section ) and will have to approved by Accepting Officer before Finalization.
Special works: (i) Single living accn for 19 Havs and 65 OR's (S+4) Total plinth Area -2276.04 Sqm
(ii) Single living accn for 15 JCO's (G+2) including Stair case and baggage room Total plinth Area -644.16 Sqm
(iii) Single living accn for 09 Major and for 02 Capt (G+2) including servant qtrs, box room, attached toilet area and goods lift size etc Total plinth Area -860.14+148.64+51.56 = 1060.34 Sqm
Auth works:(i) Single living accn for 23 Havs and 189 OR's (S+4) including store room, beggage room, sanitary block Total plinth Area -5468.00 Sqm
(ii) Cook house and Dinning hall (S+4) for 42 Havs and 290 OR's (Total 332 Ors) Kitchen, meat room, dry store, fresh store etc Total plinth Area -728.08+324.18=1052.26 Sqm
(iii) Single living accn for 06 JCO's (G+2) including baggage room Total plinth Area -278.10 Sqm
(iv) JCO's Mess for 25 JCO's including mess room, club room, toilet etc Total plinth Area -359.8 Sqm
(v) Single living accn for 01 Capt (S/S) including servant qtrs, baggage room etc Total plinth Area - 65.91+18.58= 84.49 Sqm
(vi) Officer's Mess for 23 str of Officers including mess room, bar room, libarary, kitchen, mess office, silver room, guest room, wine store, plate room etc Total plinth Area - 881.90 Sqm
(vii) Office and Administration Accn (S+2) including Offrr's Mess for 23 str of Officers including , libarary, guest room, Driver room, Sanitary annex Total plinth Area - 1916.00 Sqm
(vii) MT Office and LRW office including sanitary annex Total plinth Area - 80.67+38.50= 119.17 Sqm
(ix) Guard house and ancillaries, URC (G+1), OR's institute, and Educational building (G+2) Total plinth Area - 162.00+267.46+158.03+690.40=1277.89sqm
(x) Religious Institute,Gd rest room for 02 NCOs and 06 ORs and lift (08 x passengers) Total plinth Area - 75.00+493.00+144.19= 712.19 Sqm | | |